Inspection of Destroyed Real Estate in Sumy: Diagnostics Under Conditions of Constant Shelling
Sumy is one of the cities experiencing the most intense shelling. As of early December 2025, the Russian army had struck the territory of the Sumy territorial community 672 times using various types of weapons. As a result of these strikes, 72 residents of Sumy were killed, and 434 were injured. The Russians damaged 303 non-residential buildings and completely destroyed another 27. Technical inspection of destroyed real estate in Sumy is a critical stage for determining the feasibility of restoring the housing stock, planning repair work, and obtaining compensation payments. The procedure is carried out in accordance with the Methodology for Inspecting Buildings and Structures Damaged as a Result of Emergencies, Hostilities, and Terrorist Acts, as well as in compliance with DBN V.1.2-14:2018.
When Inspection of Destroyed Real Estate in Sumy is Necessary
The main grounds for ordering a technical inspection of damaged objects in Sumy are:
- recording damage caused by missile strikes, shelling, or UAV attacks to receive compensation under the eRecovery (“єВідновлення”) program;
- assessing the technical condition of buildings affected by blast waves to make a decision on major repairs, reconstruction, or demolition;
- the need to obtain an official inspection act for submission to local self-government bodies or military administrations;
- planning restoration works on social infrastructure facilities.
Inspection work is carried out in areas where active phases of hostilities are absent. For objects in frontline zones, the possibility of remote inspection using drones and photo reports is provided.
Specifics of Inspection in Sumy: Intensity of Shelling and Variety of Destruction
Conducting a technical inspection in Sumy has a number of specific aspects caused by the intensity of hostilities:
- High intensity of damage. Constant shelling leads to the accumulation of damage, which complicates the assessment of the technical condition. The inspection must take into account both primary and secondary damage.
- Variety of damage types. Destruction ranges from local damage to windows and roofing to complete structural destruction. The inspection must cover all types of damage for correct classification and determination of the technical condition category according to DSTU 9273:2024.
- The need for remote inspection. For objects located in restricted-access zones, remote inspection is used. However, to obtain a full-fledged technical report suitable for registration in EDESSB, an on-site inspection after the completion of the active phase of hostilities is necessary.
Stages of Technical Inspection in Sumy
The workflow includes the following consecutive stages:
- Preparatory stage. Review of available design and as-built documentation (if any). Identification of zones with the greatest destruction and planning of inspection routes.
- Visual inspection. Recording visible defects: cracks, deformations, spalling, moisture traces, and corrosion. Special attention is paid to structural joints and areas around window and door openings.
- Instrumental inspection. Performing geodetic measurements to determine vertical and horizontal deformations. Conducting ultrasonic testing of concrete and masonry. Thermal imaging diagnostics to detect hidden defects and thermal bridges.
- Desk study. Analysis of the data obtained, calculation of the residual load-bearing capacity of structures. Determination of the technical condition category according to DSTU 9273:2024.
- Preparation of a technical report. Drafting conclusions and recommendations regarding the further operation, restoration, or dismantling of the object.
As experts note, even in the absence of visible destruction, structures may have hidden defects. Read about how to identify hidden defects and document them properly in our material.
Result of the Inspection and Its Legal Significance
The customer receives a technical report containing:
- an assessment of the building’s technical condition and individual structures;
- a list of identified defects with references to DBNs;
- calculations of residual load-bearing capacity;
- a conclusion on the technical condition category;
- recommendations for further actions.
The report is registered in the Unified State Electronic System in the Construction Sector (EDESSB), which gives it legal validity for submission to local self-government bodies, the State Emergency Service (SES), or court. GlobalBud Ukraine provides a full cycle of technical inspection of real estate objects with subsequent registration of the report in EDESSB, which is a mandatory condition for receiving compensation payments. The process of preparing a technical report on the destruction of a building or structure is a separate stage that requires a professional approach and proper execution.
Cost and Timeframe of the Inspection
The cost of a technical inspection of destroyed real estate in Sumy is determined individually for each object. The main pricing factors are the building’s area, the degree of destruction, the number of structural elements requiring instrumental diagnostics, as well as the need to use remote methods. The timeframe for completing the work depends on the scale of damage and the accessibility of the object.
Frequently Asked Questions
Is it possible to receive compensation for destroyed housing in Sumy without a technical inspection?
To receive compensation underрти -> under the eRecovery program, a commission inspection of the damaged property must be carried out. A technical report by an independent expert registered in EDESSB can be used as additional evidence of the extent of damage, especially in cases whereрти -> where the commission’s decision is appealed.
How is the inspection carried out if the building is located in a frontline zone?
For objects in frontline zones, remote inspection involving drones and photo reports is provided. However, to obtain a full-fledged technical report suitable for registration in EDESSB, an on-site inspection after the completion of the active phase of hostilities is necessary.
What are the consequences in case of the absence of a technical inspection of destroyed real estate?
The absence of a technical inspection makes it impossible to receive compensation for damaged property, as well as to make an informed decision onрти -> on the restoration, reconstruction, or demolition ofрти -> of the object. In addition, operating a damaged building without proper inspection poses a threat to human life and health. In cases where destruction is critical, рти -> the dismantling or demolition of buildings and structures may be required, which also demands proper technical justification.
