Support at All Stages of Gas Station Construction

The construction of a gas station (GS) is a complex process that requires compliance with building codes, environmental standards, and legal regulations. For a successful project implementation, professional support is needed at all stages – from land selection to commissioning.

Main Stages of Gas Station Construction

1. Land Selection and Urban Planning Analysis

Before starting construction, it is necessary to assess the land plot’s compliance with the requirements of DBN B.2.3-5:2018 “Automobile Roads. General Provisions” and DBN B.2.2-20:2008 “Gas Stations”. It is important to consider:

  • Land Category – whether the construction of a gas station is allowed in the selected zone.
  • Availability of Engineering Communications – water supply, electricity, sewage.
  • Compliance with Sanitary Protection Zones – according to DSP 173-96 requirements.

2. Development of Project Documentation

The design of a gas station must comply with DBN requirements and include the following aspects:

  • General Plan – location of buildings, fuel tanks, service areas.
  • Structural Solutions – selection of materials and construction technologies.
  • Engineering Networks – water supply, electricity, drainage systems.
  • Fire Safety Measures – in accordance with DBN B.1.1-7:2016 “Fire Safety of Construction Objects”.

Project documentation undergoes an expert review following the Law of Ukraine “On Regulation of Urban Development Activities.”

Want to know the cost of services
for your situation?

Call a consultant

+38 (050) 697-78-54

3. Obtaining Permits

Gas station construction is impossible without obtaining the necessary permits:

  • Urban Planning Conditions and Restrictions (according to DBN A.2.2-3:2014).
  • Construction Permit (issued by the State Inspection of Architecture and Urban Planning of Ukraine – DIAM).
  • Environmental Assessments – compliance with environmental legislation.

4. Construction and Equipment Installation

Construction work includes:

  • Site preparation and foundation laying.
  • Installation of fuel storage tanks.
  • Connection of communications and engineering systems.
  • Installation of fuel dispensing equipment.

Compliance with construction standards is monitored through technical supervision.

5. Commissioning the Gas Station

The final stage is obtaining a certificate of readiness. This includes:

  • Verification of compliance with technical requirements.
  • Fire and environmental assessments.
  • State architectural and construction control.

After that, the gas station is entered into the register of high-risk objects and receives an operating permit.

Why Choose GlobalBud Ukraine?

The company GlobalBud Ukraine provides a full range of services for supporting gas station construction, including:

  • Legal Support – obtaining permits, interaction with state authorities.
  • Design and Expertise – development of technical documentation in compliance with regulations.
  • Technical Supervision – quality control of construction work.
  • Commissioning – assistance in obtaining all necessary certificates and permits.

Contact GlobalBud Ukraine, and we will provide professional support for your gas station construction at all stages!

Need an initial consultation?

We will help you solve the problem within 1 day

    Залиште ваше запитання і ми вам зателефонуємо
    або зателефонуйте самі нам за номером
    +38 (050) 697-78-54


    Наскільки стаття була корисною?

    Натисніть щоб оцінити!

    Середня оцінка / 5. Кількість оцінок:

    Оцінок поки немає. Оцініть першим.

    Слідкуйте за нами в соцмережах

    • Concrete Foundation Damage
      Concrete Foundation Damage: Causes and Repair Methods Concrete foundation damage is one of the most common issues in construction and building эксплуатации. Timely detection of defects and a properly selected foundation repair strategy help prevent аварийные ситуации and significant financial losses. This article outlines the key causes of foundation deterioration, …
    • Crack in a House Foundation
      Crack in a House Foundation: Causes, Inspection, and Strengthening Methods A crack in a house foundation is not merely a local defect in concrete or masonry, but also a potential sign of a failure in the overall structural system of the building. In most cases, foundation cracks occur due to …
    • Legal Due Diligence of Commercial and Residential Real Estate
      Legal Due Diligence of Commercial and Residential Real Estate Real estate legal due diligence is a comprehensive review of the legal status of a property aimed at identifying risks prior to purchase, sale, lease, or investment. In the Ukrainian market, where a significant number of properties have a complex ownership …
    • Cracks Around Windows and Doors
      Cracks Around Windows and Doors: Causes, Structural Risks, and Repair Options Cracks around window and door openings are among the most common building defects in residential and commercial properties. These zones act as structural stress concentration points within walls, so even minor irregularities may result in cracking, deformation, and redistribution …

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Call Now Button