Conclusion on inclusiveness (accessibility)

An inclusivity conclusion is a document that confirms the compliance of a construction or reconstruction project with the requirements for accessibility for people with limited mobility. Its development is an important part of urban planning documentation and may be necessary to obtain construction permits or commissioning of the facility.

Regulatory framework

The requirements for accessibility of buildings and structures in Ukraine are regulated by the following legal acts:

  • DBN B.2.2-40:2018 “Inclusivity of Buildings and Structures” – sets requirements for the design, construction and reconstruction of facilities that must be accessible to people with limited mobility.
  • The Law of Ukraine “On Construction Standards” defines general provisions for compliance with the State Building Standards during design and construction.
  • The UN Convention on the Rights of Persons with Disabilities obliges Ukraine to create conditions for the accessibility of residential and public buildings.

For which objects is an inclusivity conclusion required?

Such a conclusion is required for:

  • Public buildings (shopping centers, hospitals, educational institutions, administrative buildings, etc.)
  • Residential complexes (especially if public spaces are provided).
  • Infrastructure facilities (public transport stops, train stations, parking lots).
  • Buildings undergoing reconstruction or major repairs, if they involve improving accessibility for people with limited mobility.

Do you want to know the cost of services
for your situation?

Call a consultant

+38 (050) 697-78-54

What does an inclusivity opinion include?

The document contains the following sections:

  • Analysis of the facility for compliance with inclusivity requirements.
  • Description of accessible elements (ramps, elevators, tactile signs, special bathrooms, etc.)
  • Conclusions and recommendations for eliminating deficiencies, if any.

Who prepares the inclusivity report?

The conclusion is prepared by specialized organizations that have relevant certified experts. These can be design organizations, independent expert institutions, or companies engaged in technical audit of construction. GlobalBud Ukraine is such a company.

How do I get an inclusivity conclusion?

The procedure consists of several stages:

  • Analysis of project documentation – checking for solutions that ensure inclusiveness.
  • Inspection of the facility (for already constructed or reconstructed buildings).
  • Formation of a conclusion and provision of recommendations for eliminating violations (if necessary).

Why is it important to have a conclusion on inclusiveness?

The absence of this document may be grounds for refusing to accept the facility into operation. Failure to comply with the inclusivity standards may also result in fines and legal liability in accordance with Ukrainian law.

Contact our specialists

GlobalBud Ukraine provides services for the preparation of an inclusivity conclusion, as well as audits buildings for compliance with building codes. Our experts will help you prepare the necessary documentation and avoid problems at the commissioning stage.

Need an initial consultation?

We will help you solve the problem within 1 day

    Залиште ваше запитання і ми вам зателефонуємо
    або зателефонуйте самі нам за номером
    +38 (050) 697-78-54


    Наскільки стаття була корисною?

    Натисніть щоб оцінити!

    Середня оцінка / 5. Кількість оцінок:

    Оцінок поки немає. Оцініть першим.

    Слідкуйте за нами в соцмережах

    • Determining the Technical Condition of a Building in Chernihiv
      Determining the Technical Condition of a Building in Chernihiv Chernihiv is one of Ukraine’s oldest cities, an architectural pearl that has survived countless trials. Yet the most difficult trials have been in recent years. The city experiences constant shelling. In April 2026, as a result of a UAV attack, the …
    • Determining the Technical Condition of a Building in Poltava
      Determining the Technical Condition of a Building in Poltava Poltava is a city with a rich history and a restrained yet stable real estate market. There is no large-scale development here like in the capital, but it has its own distinct feature — the contrast between historical development and modern …
    • Determining the Technical Condition of a Building in Cherkasy
      Determining the Technical Condition of a Building in Cherkasy Cherkasy is one of the few Ukrainian cities located on the right bank of the Dnipro River. Its relief consists of hills, ravines, and slopes that create a picturesque landscape, yet at the same time pose serious challenges for buildings. Loess …
    • Determining the Technical Condition of a Building in Vinnytsia
      Determining the Technical Condition of a Building in Vinnytsia Vinnytsia is one of the few cities where the real estate market demonstrates stable growth even in difficult times. As of September 2025, the average cost of a square meter here reached approximately $1,200. A high price, however, does not always …

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Call Now Button