Permit for the construction of a gas station

The construction of a gas station requires careful adherence to urban planning, environmental and fire safety regulations. One of the key stages of such a project is obtaining a construction permit. Let’s take a look at what documents are required, what stages the developer goes through, and what to look for when applying for permits.

1. Requirements for the land plot

Before obtaining a permit for the construction of a gas station, you need to make sure that the land plot meets the requirements:

  • Designated purpose – according to the Classifier of types of designated purpose of land, the land plot must be suitable for the location of a fuel and energy facility.
  • Urban planning documentation – it should be checked whether the location of the filling station is provided for in the General Plan of the settlement, detailed plan of the territory or zoning.
  • Sanitary and environmental restrictions – it is necessary to comply with the requirements for the location of gas stations at a safe distance from residential buildings, kindergartens, hospitals and other sensitive facilities.

2. Obtaining urban planning conditions and restrictions

The next step is to obtain urban planning conditions and restrictions (UPC) from the relevant urban planning and architecture authority. They define the boundary parameters of the development, distances to other objects, height and density of the development.

Want to know the cost of services
for your situation?

Call a consultant

+38 (050) 697-78-54

3. Development of project documentation

The design documentation for the filling station shall be developed in accordance with DBN B.2.3-5:2018 “Highways” and other applicable construction standards. It should include:

  • General plan of the territory;
  • Architectural and constructive solutions;
  • Engineering networks;
  • Environmental impact assessment (if necessary);
  • Fire protection measures in accordance with DBN B.2.5-56:2014.

4. Obtaining an expert opinion

The project is examined for compliance with building codes, environmental and fire safety requirements.

5. Registration of a notification or obtaining a building permit

Depending on the class of consequences of the object:

  • CC1 – it is enough to submit a notice of commencement of construction works to the State Inspection of Architecture and Urban Development (SIAU).
  • CC2, CC3 – it is necessary to obtain a construction permit (through the SACI).

6. Start of construction

After obtaining the permit, you can start construction work in accordance with the approved project and technical specifications.

7. Putting the gas station into operation

Upon completion of the construction, it is necessary to obtain a certificate of readiness for operation. This includes:

  • conducting a technical inspection,
  • checking the compliance of the construction with the project documentation,
  • obtaining the necessary certificates from the fire and environmental services.

Don’t hesitate to contact us

The construction of a gas station is a complex multi-stage process that requires careful compliance with regulations and legal requirements. Mistakes or lack of necessary permits can lead to fines or even dismantling of the facility. To avoid risks and obtain a permit for the construction of a gas station quickly and smoothly, contact GlobalBud Ukraine. Our specialists will help you with the preparation of permits, support of the construction process and commissioning of the facility.

Need an initial consultation?

We will help you solve the problem within 1 day

    Залиште ваше запитання і ми вам зателефонуємо
    або зателефонуйте самі нам за номером
    +38 (050) 697-78-54


    Наскільки стаття була корисною?

    Натисніть щоб оцінити!

    Середня оцінка / 5. Кількість оцінок:

    Оцінок поки немає. Оцініть першим.

    Слідкуйте за нами в соцмережах

    • The NBU Will Inspect Banks for Inclusivity Starting in 2026
      The NBU Will Inspect Banks for Inclusivity Starting in 2026: How to Prepare a Branch for Inspection Starting in 2026, the National Bank of Ukraine will begin assessing banks for the level of inclusivity and accessibility of financial services. This was announced by NBU Governor Andriy Pyshnyy. This new supervisory …
    • Technical Opinion on the Unsafe Condition of a Building
      Technical Opinion on the Unsafe Condition of a Building Technical Opinion on the Unsafe Condition of a Building is an official engineering document confirming that a building or its structural elements are in a hazardous technical condition and may pose a threat to people or property. Such an opinion is …
    • Preparation of a Technical Report on the Destruction of a Building or Structure
      Preparation of a Technical Report on the Destruction of a Building or Structure A technical report on the destruction of a building is an engineering document that confirms the fact of damage to or complete destruction of a real estate asset and contains a professional analysis of its technical condition. …
    • Accessibility Compliance Review under DBN B.2.2-40:2018
      Accessibility Compliance Review under DBN B.2.2-40:2018 Accessibility Compliance Review under DBN B.2.2-40:2018 is a comprehensive assessment of a building, structure, or site for compliance with the inclusivity and barrier-free accessibility requirements established by the state building standards of Ukraine. Such a review makes it possible to determine whether persons with …

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Call Now Button