Technical Report on the Condition of Building Structures

Technical Report on the Condition of Building Structures — is an official document that provides an assessment of the technical condition of load-bearing and enclosing elements of a building. Such a report is mandatory in a number of cases related to reconstruction, remodeling, commissioning of an object, or resolving legal disputes regarding real estate.

When is a Technical Report Needed?

A technical report on the condition of structures is required in the following situations:

  • Before reconstruction or remodeling of premises.
    For example, when demolishing walls, combining rooms, or changing the functional purpose of a space.

  • For legalization of unauthorized construction or remodeling.
    The report is required for preparing technical documentation and submission to the State Architectural and Construction Inspectorate.

  • When commissioning a building after construction or major repairs.

  • In case of emergency condition of the building or its separate elements.
    This allows making decisions regarding repair, strengthening, or demolition.

  • In court cases regarding structural failures or property valuation.

  • To confirm the safe technical condition of a property during real estate purchase and sale.

Want to know the cost of services
for your case?

Call our consultant

+38 (050) 697-78-54

What Does a Technical Report Include?

The document is prepared based on a survey of building structures, conducted by qualified engineers in accordance with DSTU and DBN standards.

The structure of a technical report usually includes:

  1. General information about the object: address, purpose, technical characteristics.

  2. Description of structural elements: foundation, walls, floors, roof, etc.

  3. Results of visual and instrumental surveys.

  4. Assessment of technical condition: on a scale — serviceable, operable, limited operability, emergency.

  5. Recommendations: strengthening, repairs, or demolition of structures.

  6. Conclusion: overall safety assessment of further operation of the object.

Who Has the Right to Prepare a Technical Report?

According to Ukrainian legislation (Law of Ukraine “On Architectural Activities”, Law “On Urban Development Regulation”), technical reports may be prepared by:

  • Certified structural engineers with appropriate qualifications and work experience.

  • Business entities licensed to perform engineering and technical works.

GlobalBud Ukraine employs certified specialists who perform a full range of surveys and prepare technical reports recognized by state authorities, courts, and notaries.

How is the Survey Conducted?

The process of preparing a technical report includes several stages:

  1. Collection of initial data: technical passport, project documentation (if available).

  2. Site visit by specialists.

  3. Visual and instrumental survey of structures.

  4. Data processing, calculations, preparation of the report.

  5. Delivery of the signed and certified document to the client.

Common Client Mistakes

  • Hiring uncertified contractors — documents are not accepted by regulatory authorities.

  • Remodeling without a preliminary technical report — fines, suspension of construction.

  • Ignoring recommendations from the report — leads to emergency situations.

Cost and Timeframe

The cost of a technical report depends on:

  • the size of the object;

  • complexity of structures;

  • availability of technical documentation;

  • urgency of execution.

Standard execution time — from 3 to 7 working days. If necessary, urgent preparation is possible.

Order a Technical Report from GlobalBud Ukraine

GlobalBud Ukraine offers building inspection and technical report preparation services on a turnkey basis. We work with individuals as well as businesses, including international companies. Our engineers and lawyers provide a comprehensive approach that helps avoid legal and technical risks.

Contact us to get an official technical report recognized by all state and regulatory authorities.

Need an initial consultation?

We can help you resolve the issue within 1 day

    Залиште ваше запитання і ми вам зателефонуємо
    або зателефонуйте самі нам за номером
    +38 (050) 697-78-54


    Наскільки стаття була корисною?

    Натисніть щоб оцінити!

    Середня оцінка / 5. Кількість оцінок:

    Оцінок поки немає. Оцініть першим.

    Слідкуйте за нами в соцмережах

    • The NBU Will Inspect Banks for Inclusivity Starting in 2026
      The NBU Will Inspect Banks for Inclusivity Starting in 2026: How to Prepare a Branch for Inspection Starting in 2026, the National Bank of Ukraine will begin assessing banks for the level of inclusivity and accessibility of financial services. This was announced by NBU Governor Andriy Pyshnyy. This new supervisory …
    • Technical Opinion on the Unsafe Condition of a Building
      Technical Opinion on the Unsafe Condition of a Building Technical Opinion on the Unsafe Condition of a Building is an official engineering document confirming that a building or its structural elements are in a hazardous technical condition and may pose a threat to people or property. Such an opinion is …
    • Preparation of a Technical Report on the Destruction of a Building or Structure
      Preparation of a Technical Report on the Destruction of a Building or Structure A technical report on the destruction of a building is an engineering document that confirms the fact of damage to or complete destruction of a real estate asset and contains a professional analysis of its technical condition. …
    • Accessibility Compliance Review under DBN B.2.2-40:2018
      Accessibility Compliance Review under DBN B.2.2-40:2018 Accessibility Compliance Review under DBN B.2.2-40:2018 is a comprehensive assessment of a building, structure, or site for compliance with the inclusivity and barrier-free accessibility requirements established by the state building standards of Ukraine. Such a review makes it possible to determine whether persons with …

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Call Now Button