{"id":15803,"date":"2026-07-24T12:12:12","date_gmt":"2026-07-24T12:12:12","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=15803"},"modified":"2026-07-24T12:18:51","modified_gmt":"2026-07-24T12:18:51","slug":"inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/","title":{"rendered":"Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects"},"content":{"rendered":"<h2>Land, Building, and Infrastructure Due Diligence for Commercial Projects<\/h2>\r\n\r\n<h2><b>Why Comprehensive Due Diligence Is Essential Before a Commercial Project<\/b><\/h2>\r\n\r\n<p><span style=\"font-weight: 400;\">First and foremost, the results of the inspection will answer whether you can implement your planned project on a specific plot of land and what additional costs you will incur.<\/span><\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">Any large-scale investment project or industrial development requires detailed preparation even before the design phase and determination of the building footprint. A professional comprehensive inspection of the land parcel, existing buildings, and infrastructure allows you to assess not only the legal status of the asset but also the actual technical feasibility of constructing or renovating the facility.<\/span><\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">If you plan to build commercial facilities\u2014such as a shopping mall, logistics center, office building, fuel station, or manufacturing complex\u2014a timely, comprehensive analysis of the land parcel is the only way to avoid critical mistakes and financial losses before any money is invested in the asset.<\/span><\/p>\r\n\r\n<p>A mistake made during the site selection phase or an underestimation of the condition of existing buildings costs orders of magnitude more than the site inspection for commercial construction itself\u2014because such issues are often discovered only after the purchase, when it is difficult or impossible to make changes.<\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-definitions pwmblock definitions definitions--info section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"definitions__contblock\">\r\n<div class=\"definitions__wrapper\">\r\n<div class=\"definitions__text text\">With the experts at GlobalBud Ukraine, you gain full control over the situation and a guarantee of protecting your investment even before you invest in the property.<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2><b>Why You Should Trust Us with Your Due Diligence<\/b><\/h2>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-numbers pwmblock numbersblock section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"numbersblock__contblock\">\r\n<div class=\"numbersblock__wrapper\">\r\n<div class=\"numbersblock__items\">\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">15+ years of practical experience in construction and engineering surveys<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 our specialists don\u2019t just collect data; they understand how that data will impact the feasibility of the project<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">Certificates of qualification for conducting engineering surveys, Registration in the Unified State Electronic System in the Construction Sector (EDESSB)<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 engineering conclusions are prepared in accordance with established forms and signed by authorized personnel, ensuring their legal validity<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">A comprehensive approach with a single point of contact<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 engineers, surveyors, and lawyers work as a single team, so you don\u2019t need to search separately for specialists in geology, legal due diligence, or technical inspections of existing buildings<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">Experience in supporting investment projects<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 we understand exactly what data an investor needs to make a financing decision<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">A written engineering conclusion with a clear structure, not just descriptive text<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 we document each identified issue or obstacle as a separate item and assign it a severity level (critical, significant, minor) so it\u2019s immediately clear what requires an immediate decision and what can be postponed or simply taken into consideration<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<div class=\"numbersblock__item\">\r\n<div class=\"numbersblock__itemtitle\">Every finding is backed by evidence<\/div>\r\n<div class=\"numbersblock__text\">\r\n<p>\u2014 photos, measurements, excerpts from documentation, or investigation results\u2014not merely a statement that &#8220;there is a problem.&#8221; This allows engineers, lawyers, or project decision-makers to independently verify every finding and understand the basis for our conclusions without relying solely on our opinion<\/p>\r\n<\/div>\r\n<\/div>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n<h2 class=\"lists-block__title\">When Comprehensive Due Diligence Is Required<\/h2>\r\n<div class=\"lists-block__text text\">\r\n<p>Land due diligence prior to purchase is mandatory in the following cases:<\/p>\r\n<\/div>\r\n\r\n<ul class=\"lists-block__listul listul\">\r\n<li>Purchasing land parcel for commercial real estate (shopping malls, logistics centers, office buildings, fuel stations, industrial complexes)<\/li>\r\n<li>Purchasing land parcel with existing buildings or structures that are planned to be renovated or demolished<\/li>\r\n<li>Planning construction in areas with unstable soil, high groundwater levels, or complex topography<\/li>\r\n<li>The need to attract an investor or secure a loan, which requires an official engineering conclusion<\/li>\r\n<li>Preliminary assessment of costs for foundations, drainage, site grading, and utility connections<\/li>\r\n<li>Inspection of legal restrictions (protected areas, red lines, easements) that affect the permissible building area<\/li>\r\n<\/ul>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">Assessing a land parcel in the early stages allows you to weed out unsuitable options and focus on properties with real potential\u2014and even rejecting an unsuitable lot after completing the due diligence represents direct cost savings, since the cost of verifying the lot is far lower than the cost of a misguided investment.<\/span><\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-definitions pwmblock definitions definitions--greybg section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"definitions__contblock\">\r\n<div class=\"definitions__wrapper\">\r\n<div class=\"definitions__text text\">\r\n<p>Our expertise will allow you to weed out unprofitable options early on, focus on properties with real potential, and save up to 30% of your future project\u2019s budget.<\/p>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<h2><b>What Is Included in Land Due Diligence<\/b><\/h2>\r\n\r\n<h3><b>Soil Analysis and Engineering Geological Investigations<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">A specialized geological survey of the site serves as the foundation for designing reliable structures. Engineering-geological surveys help identify hazardous geological processes (risks of subsidence and flooding) and determine the general conditions for future construction.<\/span><\/p>\r\n\r\n<h3><b>Determining the Geological Cross-Section and Bearing Capacity of the Soil<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">Our experts create an accurate geological cross-section of the site, determine the bearing capacity of the soil, and record the actual groundwater level. It is the basic geology of the land parcel that dictates the choice of foundation type and directly influences the cost estimate for the foundation works.<\/span><\/p>\r\n\r\n<h3><b>Topographic Survey of the Land Parcel and Relief Assessment<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">Surveying work establishes the boundaries of the site and the configuration of existing structures. Following the topographic survey, an analysis of the site\u2019s topography is conducted. If a critical slope or significant elevation differences are identified, the client receives a cost estimate for the site\u2019s preparation.<\/span><\/p>\r\n\r\n<h3><b>Determination of Permissible Development Parameters<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">Taking into account sanitary and protective zones as well as the master plan, the maximum allowable building area is calculated. This allows you to determine, even before the design phase begins, whether the desired building footprint can be accommodated on the site.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--cultwo section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n<h2 class=\"lists-block__title\">What Is Included in Building Due Diligence<\/h2>\r\n<div class=\"lists-block__text text\">\r\n<p>If the plot already has existing buildings or structures\u2014whether slated for demolition, reconstruction, or continued use\u2014we conduct a technical inspection of these structures as part of the same comprehensive audit:<\/p>\r\n<\/div>\r\n<div class=\"lists-block__split\">\r\n<ul class=\"lists-block__listul listul dnone\">\r\n<li>1111<\/li>\r\n<li>2222<\/li>\r\n<li>3333<\/li>\r\n<li>4444<\/li>\r\n<\/ul>\r\n\r\n<ul class=\"lists-block__listul\">\r\n<li>Assessment of the technical condition of existing buildings\u2014condition category (good condition, serviceable, limited serviceability, unsafe), remaining service life of structures<\/li>\r\n<li>Estimation of the cost of demolition or reinforcement\u2014if the buildings are to be demolished or partially renovated, you will know the approximate budget for these works in advance<\/li>\r\n<\/ul>\r\n\r\n<ul class=\"lists-block__listul\">\r\n<li>Determination of the feasibility of reconstruction or adding additional stories\u2014whether the existing foundation and load-bearing structures can withstand the vertical expansion required by your project<\/li>\r\n<li>Identification of hidden legal restrictions\u2014for example, heritage buildings or properties subject to encumbrances, the demolition of which is restricted or prohibited by law<\/li>\r\n<\/ul>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<h2><b>What Is Included in Infrastructure Due Diligence<\/b><\/h2>\r\n\r\n<h3><b>Assessment of Transportation Accessibility and Access Roads<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">Transportation accessibility is a key factor for a property\u2019s logistics. We analyze the existing logistics infrastructure and access roads, assess the feasibility of creating safe access points, evaluate clearance restrictions for heavy construction equipment, and evaluate the potential for access to public roads.<\/span><\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n\r\n<h3 class=\"lists-block__title\">Analysis of Utility Networks and Technical Feasibility of Utility Connections<\/h3>\r\n\r\n<div class=\"lists-block__text text\">\r\n<p>Inspection of utility networks involves a site visit to survey the nearest connection points to municipal or local utility systems. We determine:<\/p>\r\n<\/div>\r\n\r\n<ul class=\"lists-block__listul listul\">\r\n<li>The availability of reserve capacity at the transformer substation for connecting electricity to the site<\/li>\r\n<li>The diameter and pressure in the water supply systems, and the possibility of increasing flow rates for industrial needs<\/li>\r\n<li>The type and capacity of the sewer main (for domestic or stormwater runoff)<\/li>\r\n<li>The presence of a gas distribution station and the technical feasibility of increasing gas consumption<\/li>\r\n<\/ul>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">The technical feasibility of a connection is often limited even when pipes or cables are physically present\u2014due to network congestion caused by existing customers. Our analysis provides a well-founded conclusion: whether it is realistic to obtain the necessary technical specifications, or whether it is necessary to install dedicated utility lines requiring additional capital investment.<\/span><\/p>\r\n\r\n<h3><b>Calculation of Required Power and Estimated Connection Cost<\/b><\/h3>\r\n\r\n<p><span style=\"font-weight: 400;\">Based on the connection approvals of the utility networks and the architectural and planning requirements of your business, we calculate the total connected capacity for all types of utilities: electricity (kW), water (m\u00b3\/day), wastewater, and gas (m\u00b3\/hour). This allows us to estimate the connection fee and prepare a preliminary cost estimate for site preparation.<\/span><\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your specific project?<\/h3>\r\n\r\n<div class=\"simple__text text\">\r\n<p>Call our consultant<\/p>\r\n<\/div>\r\n\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n\r\n\r\n<h2 class=\"lists-block__title\">What the Client Receives<\/h2>\r\n\r\n<div class=\"lists-block__text text\">\r\n<p>A comprehensive engineering and legal assessment consisting of the following sections:<\/p>\r\n<\/div>\r\n\r\n<ul class=\"lists-block__listul listul\">\r\n<li>Geological data\u2014soil profile, bearing capacity, groundwater level<\/li>\r\n\r\n<li>Surveying data\u2014topographic survey, terrain analysis, plot boundaries<\/li>\r\n\r\n<li>Assessment of the technical condition of existing buildings (if any on the site)\u2014including an assessment of the feasibility of reconstruction or the need for demolition<\/li>\r\n\r\n<li>Data on utility networks\u2014available capacity, technical feasibility of connection, estimated cost<\/li>\r\n\r\n<li>Legal assessment\u2014inspection of restrictions, protected areas, easements, and permissible development parameters<\/li>\r\n<\/ul>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n\r\n<div class=\"lists-block__text text\">\r\n<p>In addition, the client receives:<\/p>\r\n<\/div>\r\n\r\n<ul class=\"lists-block__listul listul\">\r\n<li>A clear understanding of the plot\u2019s actual suitability for a specific project\u2014not a general assessment, but an answer tailored specifically to your development plan<\/li>\r\n\r\n<li>An estimated cost for site preparation\u2014foundation, utility connections, potential demolition\u2014to calculate the project economics before purchase<\/li>\r\n\r\n<li>A well-supported assessment of whether the site is worth purchasing or whether it is better to continue the search\u2014which in itself saves money if the property turns out to be unsuitable<\/li>\r\n\r\n<li>A complete package of documents for the investor\u2014a report to support financing decisions<\/li>\r\n<\/ul>\r\n\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">By entrusting a comprehensive audit to GlobalBud Ukraine, you reliably protect your capital from hidden pitfalls and purchase only liquid and secure assets.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n<h2 class=\"lists-block__title\">What Risks Does an Investor Face by Skipping Comprehensive Due Diligence?<\/h2>\r\n<ul class=\"lists-block__listul listul\">\r\n<li>Purchasing a land parcel with unsuitable soil\u2014this issue often comes to light during the foundation design phase, when the plot has already been purchased and the cost estimate has skyrocketed<\/li>\r\n<li>Inability to connect the required utility capacity\u2014the investor learns about utility network limitations only after purchasing the land, when changing the project or location means a loss of time and money<\/li>\r\n<li>Underestimating the cost of demolishing existing buildings\u2014making the project unprofitable after the purchase, when it\u2019s too late to back out<\/li>\r\n<li>Legal restrictions on development discovered after the fact\u2014protected areas, easements, and building setback lines\u2014which significantly reduce the permitted building area compared to the initial plan<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">A comprehensive due diligence allows you to see the real picture before investing, not after.<\/span><\/p>\r\n\r\n<h2><b>Assessment of the Site&#8217;s Suitability for Your Business Project<\/b><\/h2>\r\n\r\n<p><span style=\"font-weight: 400;\">By compiling all surveying, geological, and engineering data, along with the results of inspections of existing buildings, we conduct a final assessment of the plot for your specific business project. This comprehensive due diligence provides a clear understanding of the asset\u2019s actual investment attractiveness\u2014not in abstract terms, but specifically in relation to your plan for using the land.<\/span><\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n<h2 class=\"lists-block__title\">What the Client Receives<\/h2>\r\n<div class=\"lists-block__text text\">\r\n<p>A comprehensive engineering and legal assessment consisting of the following sections:<\/p>\r\n<\/div>\r\n<ul class=\"lists-block__listul listul\">\r\n<li>Geological data\u2014soil profile, bearing capacity, groundwater level<\/li>\r\n<li>Surveying data\u2014topographic survey, terrain analysis, plot boundaries<\/li>\r\n<li>Assessment of the technical condition of existing buildings (if any on the site)\u2014including an assessment of the feasibility of reconstruction or the need for demolition<\/li>\r\n<li>Data on utility networks\u2014available capacity, technical feasibility of connection, estimated cost<\/li>\r\n<li>Legal assessment\u2014inspection of restrictions, protected areas, easements, and permissible development parameters<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-lists pwmblock lists-block lists-block--culone section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"lists-block__contblock\">\r\n<div class=\"lists-block__wrapper\">\r\n<div class=\"lists-block__text text\">\r\n<p>In addition, the client receives:<\/p>\r\n<\/div>\r\n<ul class=\"lists-block__listul listul\">\r\n<li>A clear understanding of the plot\u2019s actual suitability for a specific project\u2014not a general assessment, but an answer tailored specifically to your development plan<\/li>\r\n<li>An estimated cost for site preparation\u2014foundation, utility connections, potential demolition\u2014to calculate the project economics before purchase<\/li>\r\n<li>A well-supported assessment of whether the site is worth purchasing or whether you should continue the search\u2014which in itself saves money if the property turns out to be unsuitable<\/li>\r\n<li>A complete package of documents for the investor\u2014a report to support financing decisions<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">By entrusting a comprehensive audit to GlobalBud Ukraine, you reliably protect your capital from hidden pitfalls and purchase only liquid and secure assets.<\/span><\/p>\r\n\r\n<h2><b>Cost and Timeline<\/b><\/h2>\r\n\r\n<p><span style=\"font-weight: 400;\">The exact cost of the inspection is calculated on a case-by-case basis after reviewing the site&#8217;s characteristics and existing structures. The price is influenced by the property\u2019s area, the complexity of the terrain, the density of existing development, and the scope of work required to survey the existing buildings.<\/span><\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">Estimated completion time ranges from 2 to 6 weeks, depending on the scope of the survey: a &#8220;geotechnical investigation + topographic survey + utility assessment&#8221; package for a small plot without buildings takes less time than a full audit of a large area with existing structures.<\/span><\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">To find out the exact cost and timeline for your project, submit a request with the plot\u2019s basic parameters\u2014we\u2019ll provide a quote within 1\u20132 business days.<\/span><\/p>\r\n\r\n<h2><b>FAQ \u2013 Land, Buildings, and Infrastructure Due Diligence for Commercial Projects<\/b><\/h2>\r\n\r\n<style type=\"text\/css\"><\/style><section id='' \n                class='helpie-faq accordions open-first groupSettings-133__enabled' \n                data-collection='' \n                data-pagination='0' \n                data-search='0' \n                data-pagination-enabled='0'\n                role='region'\n                aria-label='FAQ Section'\n                aria-live='polite'><h3 class=\"collection-title\">FAQ Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects<\/h3><article class=\"accordion \"><div class='helpie-faq-row'><div class='helpie-faq-col helpie-faq-col-12' ><ul><li class=\"accordion__item \"><div class=\"accordion__header \" \r\n                id=\"accordion-header-post-15804\"\r\n                role=\"button\"\r\n                aria-expanded=\"false\"\r\n                aria-controls=\"accordion-content-post-15804\"\r\n                data-id=\"post-15804\" \r\n                data-item=\"hfaq-post-15804\" \r\n                style=\"background:transparent;\" \r\n                data-tags=\"\"\r\n                tabindex=\"0\"><div class=\"accordion__title\">What should be done if a high groundwater level is detected?<\/div><\/div><div id=\"accordion-content-post-15804\" \r\n                class=\"accordion__body\" \r\n                role=\"region\"\r\n                aria-labelledby=\"accordion-header-post-15804\"\r\n                style=\"background:transparent;\"><p><span style=\"font-weight: 400\">Our engineers will develop technical recommendations regarding water diversion and drainage systems or recommend a specific type of waterproofed foundation to ensure the safe operation of the building.<\/span><\/p>\n<\/div><\/li><li class=\"accordion__item \"><div class=\"accordion__header \" \r\n                id=\"accordion-header-post-15805\"\r\n                role=\"button\"\r\n                aria-expanded=\"false\"\r\n                aria-controls=\"accordion-content-post-15805\"\r\n                data-id=\"post-15805\" \r\n                data-item=\"hfaq-post-15805\" \r\n                style=\"background:transparent;\" \r\n                data-tags=\"\"\r\n                tabindex=\"0\"><div class=\"accordion__title\">Can I order only a portion of the services\u2014for example, just the geological survey without the legal services?<\/div><\/div><div id=\"accordion-content-post-15805\" \r\n                class=\"accordion__body\" \r\n                role=\"region\"\r\n                aria-labelledby=\"accordion-header-post-15805\"\r\n                style=\"background:transparent;\"><p><span style=\"font-weight: 400\">Yes, we provide both a full suite of services and individual components\u2014geology, surveying, utility network inspections, or technical inspections of existing buildings\u2014separately, depending on your request.<\/span><\/p>\n<\/div><\/li><li class=\"accordion__item \"><div class=\"accordion__header \" \r\n                id=\"accordion-header-post-15806\"\r\n                role=\"button\"\r\n                aria-expanded=\"false\"\r\n                aria-controls=\"accordion-content-post-15806\"\r\n                data-id=\"post-15806\" \r\n                data-item=\"hfaq-post-15806\" \r\n                style=\"background:transparent;\" \r\n                data-tags=\"\"\r\n                tabindex=\"0\"><div class=\"accordion__title\">What should I do if the site turns out to be unsuitable after the inspection?<\/div><\/div><div id=\"accordion-content-post-15806\" \r\n                class=\"accordion__body\" \r\n                role=\"region\"\r\n                aria-labelledby=\"accordion-header-post-15806\"\r\n                style=\"background:transparent;\"><p><span style=\"font-weight: 400\">This is also a valuable outcome: you save a significantly larger amount than the cost of the inspection by avoiding an investment in an unsuitable asset. We can help evaluate alternative sites using the same criteria.<\/span><\/p>\n<\/div><\/li><li class=\"accordion__item \"><div class=\"accordion__header \" \r\n                id=\"accordion-header-post-15807\"\r\n                role=\"button\"\r\n                aria-expanded=\"false\"\r\n                aria-controls=\"accordion-content-post-15807\"\r\n                data-id=\"post-15807\" \r\n                data-item=\"hfaq-post-15807\" \r\n                style=\"background:transparent;\" \r\n                data-tags=\"\"\r\n                tabindex=\"0\"><div class=\"accordion__title\">How much does a comprehensive inspection cost?<\/div><\/div><div id=\"accordion-content-post-15807\" \r\n                class=\"accordion__body\" \r\n                role=\"region\"\r\n                aria-labelledby=\"accordion-header-post-15807\"\r\n                style=\"background:transparent;\"><p><span style=\"font-weight: 400\">The cost depends on the area, the complexity of the terrain, the need for drilling, and the scope of the inspection of existing buildings. We provide an exact estimate after reviewing the details of your property\u2014free of charge and with no obligation.<\/span><\/p>\n<\/div><\/li><li class=\"accordion__item \"><div class=\"accordion__header \" \r\n                id=\"accordion-header-post-15808\"\r\n                role=\"button\"\r\n                aria-expanded=\"false\"\r\n                aria-controls=\"accordion-content-post-15808\"\r\n                data-id=\"post-15808\" \r\n                data-item=\"hfaq-post-15808\" \r\n                style=\"background:transparent;\" \r\n                data-tags=\"\"\r\n                tabindex=\"0\"><div class=\"accordion__title\">Do you inspect plots with existing buildings that we plan to demolish?<\/div><\/div><div id=\"accordion-content-post-15808\" \r\n                class=\"accordion__body\" \r\n                role=\"region\"\r\n                aria-labelledby=\"accordion-header-post-15808\"\r\n                style=\"background:transparent;\"><p><span style=\"font-weight: 400\">Yes, we assess the technical condition of such buildings and the estimated cost of demolition as part of the comprehensive inspection\u2014this allows you to factor these costs into the project budget in advance.<\/span><\/p>\n<\/div><\/li><\/ul><\/div><\/div><\/article><\/section>\r\n\r\n<h2><b>Request an Inspection of the Site, Buildings, and Infrastructure<\/b><\/h2>\r\n\r\n<p><span style=\"font-weight: 400;\">An assessment of land, buildings, and infrastructure for a commercial project from GlobalBud Ukraine gives you a head start right from the beginning of construction.<\/span><\/p>\r\n\r\n<p><span style=\"font-weight: 400;\">Call us or submit a request on our website right now to receive a personalized consultation.<\/span><\/p>\r\n\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8315-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/15803#wpcf7-f8315-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8315\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8315-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>Leave your question and we will call you<br \/>\nor call us yourself at the number<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone number\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Your question\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"Send\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Land, Building, and Infrastructure Due Diligence for Commercial Projects Why Comprehensive Due Diligence Is Essential Before a Commercial Project First and foremost, the results of the inspection will answer whether you can implement your planned project on a specific plot of land and what additional costs you will incur. Any &hellip;<\/p>\n","protected":false},"author":1,"featured_media":15464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=15463"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-24T12:12:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-24T12:18:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/07\/35333.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_gbu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_gbu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\"},\"author\":{\"name\":\"admin_gbu\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\"},\"headline\":\"Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects\",\"datePublished\":\"2026-07-24T12:12:12+00:00\",\"dateModified\":\"2026-07-24T12:18:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\"},\"wordCount\":2116,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\",\"name\":\"\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-07-24T12:12:12+00:00\",\"dateModified\":\"2026-07-24T12:18:51+00:00\",\"description\":\"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\",\"name\":\"admin_gbu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"caption\":\"admin_gbu\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine","description":"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/","og_locale":"en_US","og_type":"article","og_title":"\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine","og_description":"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-07-24T12:12:12+00:00","article_modified_time":"2026-07-24T12:18:51+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/07\/35333.jpg","type":"image\/jpeg"}],"author":"admin_gbu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_gbu","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/"},"author":{"name":"admin_gbu","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b"},"headline":"Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects","datePublished":"2026-07-24T12:12:12+00:00","dateModified":"2026-07-24T12:18:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/"},"wordCount":2116,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/","name":"\u25baDue Diligence for Land, Buildings, and Infrastructure for Commercial Projects | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-07-24T12:12:12+00:00","dateModified":"2026-07-24T12:18:51+00:00","description":"Inspection of land, buildings, and infrastructure for commercial projects \u27a5 \u260e+38(073)499-54-40 Soil analysis, topographic survey, utility networks, and engineering and legal assessment\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience \u2714No middlemen","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inspection-of-land-buildings-and-infrastructure-for-commercial-projects-globalbud-ukraine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Due Diligence for Land, Buildings, and Infrastructure for Commercial Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b","name":"admin_gbu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","caption":"admin_gbu"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/15803"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=15803"}],"version-history":[{"count":2,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/15803\/revisions"}],"predecessor-version":[{"id":15810,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/15803\/revisions\/15810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/15464"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=15803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=15803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=15803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}