{"id":14664,"date":"2026-06-29T16:23:58","date_gmt":"2026-06-29T16:23:58","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=14664"},"modified":"2026-06-29T16:23:58","modified_gmt":"2026-06-29T16:23:58","slug":"suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/","title":{"rendered":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning"},"content":{"rendered":"<h2><span style=\"font-weight: 400;\">Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">The three key stages of a construction project \u2014 obtaining urban planning conditions and restrictions (MUO), construction permits, and object commissioning \u2014 are the most critical in terms of legal risks. Each of these stages has its own procedural specifics, timelines, and documentation requirements. A mistake at any of them can lead to refusal, months of delay, or even the impossibility of completing the project. Support for obtaining MUO, construction permits, and commissioning is a comprehensive legal service that ensures the lawful and efficient completion of all three stages, allowing the developer to focus on construction rather than bureaucratic procedures.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a consultation<\/a><\/div>\r\n\r\n<h2><span style=\"font-weight: 400;\">Stage 1. Obtaining Urban Planning Conditions and Restrictions (MUO)<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Urban planning conditions and restrictions are the first and fundamental document that opens the path to construction. Effectively, it is at this stage that it is verified whether the land plot can realize the claimed development model, whether intentions comply with the territory&#8217;s functional purpose, and what restrictions will apply to the project moving forward. MUO today are not just &#8220;reference for the designer,&#8221; but a document that defines the project&#8217;s base economics and parameters: height, density, setbacks, allowable development percentage, land use restrictions, and civil protection requirements.<\/span> <span style=\"font-weight: 400;\">MUO Procedure:<\/span> <span style=\"font-weight: 400;\">A natural or legal person who intends to develop a land plot owned or used by such person must obtain urban planning conditions and restrictions for designing the construction object. To do this, it is necessary to submit the following to the authorized urban planning and architecture body:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an application for urban planning conditions and restrictions;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">a copy of a document certifying the right of ownership or usage of the land plot;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an excerpt from the topographic-geodetic plan M 1:2000;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an urban planning calculation defining the customer&#8217;s investment intentions.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">Important: this list of documents for providing MUO is exhaustive. The authorized body has no right to demand additional documents. The term for providing MUO is 10 working days from the date of application registration.<\/span> <span style=\"font-weight: 400;\">Grounds for refusal to provide MUO:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">non-submission of documents necessary for decision-making;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">detection of inaccurate information in documents;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">inconsistency of development intentions with urban planning documentation requirements at the local level.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">That is why it is critically important to verify whether your intentions meet urban planning documentation requirements before submitting the application.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Stage 2. Obtaining a Construction Permit<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">After obtaining MUO and developing project documentation, the stage of obtaining the right to execute construction works follows. The document type depends on the object&#8217;s consequence class:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For CC1 objects (minor consequences) \u2014 a notification of the start of construction works is submitted via a CNAP or the &#8220;Diia&#8221; Portal.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For CC2 and CC3 objects (medium and significant consequences) \u2014 a construction permit is obtained exclusively online via the &#8220;Diia&#8221; Portal.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">Procedure for obtaining a construction permit:<\/span> <span style=\"font-weight: 400;\">To obtain a permit, it is necessary to fill out an online form on the &#8220;Diia&#8221; portal and attach the following documents in the EDESSSB personal account:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EDESSSB registration number for project documentation;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">copies of documents of ownership or usage rights for the land plot (if data is missing from the DRRP);<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">construction contract;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">data on author and technical supervision performers;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">expertise of project documentation.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">The permit is issued free of charge. The registration period is 10 days. Important: if a project changes its customer, designer, chief engineer, or architect, changes must be made to the project itself. If a contractor, author, or technical supervisor changes, the corresponding persons must add new data to the project documentation.<\/span> <span style=\"font-weight: 400;\">Common mistakes when obtaining a permit:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">incorrect determination of the object&#8217;s consequence class;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">submission of an incomplete list of documents;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">inaccurate data in documents;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">discrepancy with the urban planning plan.<\/span><\/li>\r\n<\/ul>\r\n<p><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/otrymannya-dozvolu-na-budivnycztvo-z-pershogo-razu\/\"><span style=\"font-weight: 400;\">Obtaining a construction permit on the first try<\/span><\/a><span style=\"font-weight: 400;\"> is a service that allows for avoiding refusals and saving months of work.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Stage 3. Commissioning<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Commissioning the object is the final stage of a construction project. Without it, the object remains legally &#8220;non-existent.&#8221; The commissioning procedure is regulated by Cabinet of Ministers Resolution No. 461 &#8220;On Approval of the Procedure for Commissioning Completed Construction Objects.&#8221;<\/span> <span style=\"font-weight: 400;\">Commissioning procedure:<\/span> <span style=\"font-weight: 400;\">Depending on the object&#8217;s consequence class, commissioning is carried out by:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">submitting a declaration of readiness for operation (for CC1 objects);<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">obtaining a certificate of readiness for operation (for CC2 and CC3 objects).<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">To obtain a certificate, it is necessary to submit a package of documents, which includes:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">an application for issuing a certificate;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">project documentation;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">acts of completed works;<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">documents confirming object compliance with State Building Codes (DBN);<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">author and technical supervision conclusions.<\/span><\/li>\r\n<\/ul>\r\n<p><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/yurydychnyj-suprovid-budivnycztva\/\"><span style=\"font-weight: 400;\">Legal support for construction<\/span><\/a><span style=\"font-weight: 400;\"> ensures control at each of these stages \u2014 from obtaining MUO to object commissioning.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services for your situation?<\/h3>\r\n<div class=\"simple__text text\">Call a consultant<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2><span style=\"font-weight: 400;\">New Requirements of 2025\u20132026 to Consider<\/span><\/h2>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Inclusivity \u2014 as of April 1, 2026, Amendment No. 3 to DBN V.2.2-40:2018 &#8220;Inclusivity of Buildings and Structures&#8221; came into effect, establishing new requirements for object accessibility for people with reduced mobility.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Industrial construction \u2014 new DBN V.2.2-29:2025 &#8220;Industrial Engineering Structures&#8221; are being introduced, establishing basic provisions and requirements for the design, new construction, and reconstruction of industrial buildings.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Urban planning documentation \u2014 the necessity of developing\/updating urban planning documentation at the local level has been deferred until 01.01.2028.<\/span><\/li>\r\n<\/ol>\r\n<h2><span style=\"font-weight: 400;\">Frequently Asked Questions<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">What is the validity period of MUO and a construction permit?<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Urban planning conditions and restrictions are valid for the period determined for project design, but not exceeding the period established by urban planning documentation. A construction permit is valid for the period specified in the permit, but not exceeding the period provided by project documentation. In case of need to extend the permit&#8217;s validity period, the customer must submit a corresponding application.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">What to do if the MUO validity period has expired?<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">If the MUO validity period has expired, it is necessary to contact the authorized urban planning and architecture body to obtain new MUO. The procedure for obtaining new MUO is analogous to the initial one. It is important to remember that construction without valid MUO is illegal.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Can an object be commissioned if deviations from the project were made?<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">Deviations from the project can be grounds for refusal to commission the object. If deviations are minor and do not affect the object&#8217;s safety, it is possible to make changes to the project documentation. If deviations are significant, redesigning and obtaining new permits may be required. In any case, professional legal consultation is necessary to resolve this issue.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8315-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/14664#wpcf7-f8315-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8315\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8315-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>Leave your question and we will call you<br \/>\nor call us yourself at the number<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone number\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Your question\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"Send\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n","protected":false},"excerpt":{"rendered":"<p>Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning The three key stages of a construction project \u2014 obtaining urban planning conditions and restrictions (MUO), construction permits, and object commissioning \u2014 are the most critical in terms of legal risks. Each of these stages has its own procedural specifics, &hellip;<\/p>\n","protected":false},"author":2,"featured_media":14370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=14412"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-29T16:23:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/morning-businesswoman-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"kevawebGBU\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kevawebGBU\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\"},\"author\":{\"name\":\"kevawebGBU\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\"},\"headline\":\"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning\",\"datePublished\":\"2026-06-29T16:23:58+00:00\",\"dateModified\":\"2026-06-29T16:23:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\"},\"wordCount\":1098,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\",\"name\":\"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-06-29T16:23:58+00:00\",\"dateModified\":\"2026-06-29T16:23:58+00:00\",\"description\":\"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\",\"name\":\"kevawebGBU\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"caption\":\"kevawebGBU\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine","description":"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/","og_locale":"en_US","og_type":"article","og_title":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine","og_description":"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-06-29T16:23:58+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/morning-businesswoman-scaled.jpg","type":"image\/jpeg"}],"author":"kevawebGBU","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kevawebGBU","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/"},"author":{"name":"kevawebGBU","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce"},"headline":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning","datePublished":"2026-06-29T16:23:58+00:00","dateModified":"2026-06-29T16:23:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/"},"wordCount":1098,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/","name":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-06-29T16:23:58+00:00","dateModified":"2026-06-29T16:23:58+00:00","description":"Support for Obtaining Urban Planning Conditions \u260e+38(050)697-78-54 Legal support of real estate\u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-otrymannya-muo-dozvolu-na-vykonannya-budivelnyh-robit-ta-vvedennya-v-ekspluatacziyu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Support for Obtaining Urban Planning Conditions, Construction Permits, and Commissioning"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce","name":"kevawebGBU","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","caption":"kevawebGBU"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14664"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=14664"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14664\/revisions"}],"predecessor-version":[{"id":14713,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14664\/revisions\/14713"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/14370"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=14664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=14664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=14664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}