{"id":14273,"date":"2026-06-26T16:12:45","date_gmt":"2026-06-26T16:12:45","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=14273"},"modified":"2026-06-28T18:49:36","modified_gmt":"2026-06-28T18:49:36","slug":"rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/","title":{"rendered":"Building Deterioration After a Fire: How to Assess the Real State of Structures"},"content":{"rendered":"<h2><span style=\"font-weight: 400;\">Building Deterioration After a Fire: How to Assess the Real State of Structures<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">A fire is not just about smoke, soot, and burned premises. High temperatures reaching hundreds of degrees Celsius change concrete structure, weaken rebar, and deform metal elements. Even if the flames did not spread to all floors, a building may have lost its load-bearing capacity. Damage to a building after a fire is often hidden: structures may look intact, but their strength no longer meets standards. Understanding what exactly happens to materials during heating and conducting a timely inspection is a matter of safety for people in the building.<\/span><\/p>\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a consultation<\/a><\/div>\r\n<h2><span style=\"font-weight: 400;\">What Happens to Structures During a Fire<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">The impact of fire on building materials is multifactorial and depends on the burning duration, maximum temperature, and type of structure. Load-bearing structures suffer the most damage, losing strength when heated. Main damage mechanisms include:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Loss of concrete and brick strength \u2014 when heated above 250\u2013300 \u00b0C, concrete undergoes irreversible changes: chemically bound water evaporates, and micro-cracks form due to the temperature difference between the surface and deep layers. This leads to shedding of the surface layer, cracking, and loss of load-bearing capacity.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduction in metal element strength \u2014 steel beams, columns, and trusses lose up to 50% of their strength when heated to 550\u2013600 \u00b0C. Research shows that heating steel to 500 \u00b0C reduces strength by approximately 30%, and to 600 \u00b0C by more than 60%. This leads to visible deformations, sagging, and loss of structural stability.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Destruction of protective layers \u2014 detachment of plaster, paint, as well as the concrete protective layer, exposes rebar to moisture and air, which accelerates corrosion processes.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cracking due to temperature deformations \u2014 during heating, cracks develop in walls in other areas not directly in the fire zone. Hidden defects also occur, such as internal delamination of brickwork caused by impacts and heating.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Saturation of structures with smoke and soot \u2014 this not only complicates subsequent repair work but also creates a health hazard due to toxic compounds settling on surfaces.<\/span><\/li>\r\n<\/ol>\r\n<h2><span style=\"font-weight: 400;\">Why Visual Inspection is Not Enough<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Many property owners limit themselves to a surface inspection after a fire: &#8220;The walls are standing, so everything is fine.&#8221; This is a dangerous mistake. The worst-case scenario is when structures look intact but their strength is already lost. According to experts, the most frequent damages are blown-out windows and cracks in walls, but damage to the foundation is the most critical.<\/span> <span style=\"font-weight: 400;\">A technical report on the building&#8217;s condition should be obtained after any damage that may have occurred due to a fire. Even if structures appear intact at first glance, there may be hidden damages that will later lead to more serious problems. Determining the residual load-bearing capacity of structures after a fire requires special knowledge and equipment, as well as verification calculations taking into account the reduction in rebar and concrete resistance.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">What is Checked During a Technical Inspection After a Fire<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">A comprehensive technical inspection after a fire is conducted in accordance with the Methodology for surveying buildings damaged by emergency situations. Specialists perform a number of key procedures:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Visual and instrumental inspection \u2014 identifying cracks, deformations, delamination, and signs of high-temperature exposure (concrete discoloration, melting).<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Assessment of load-bearing rebar condition \u2014 determining corrosion depth and loss of bonding with concrete, which is critical for reinforced concrete structures.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Determination of actual material strength \u2014 using non-destructive testing methods (ultrasound, sclerometry) to evaluate the residual strength of concrete and brick.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Checking structural geometry \u2014 measuring deflections, shifts, and deviations from vertical to identify deformations caused by temperature effects.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Calculation of residual load-bearing capacity \u2014 based on collected data, verification calculations are performed to determine whether the structure can withstand operational loads.<\/span><\/li>\r\n<\/ol>\r\n<p><span style=\"font-weight: 400;\">Based on the inspection results, a technical report is compiled, containing an assessment of the facility&#8217;s condition, a list of identified defects, and recommendations for further operation or restoration.<\/span><\/p>\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n<h2><span style=\"font-weight: 400;\">How Building Restoration After a Fire Occurs<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">The choice of restoration method depends on the degree of structural damage:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Local repair \u2014 replacing damaged plaster sections, restoring the concrete protective layer, and anti-corrosive treatment of rebar.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structural reinforcement \u2014 installing additional metal jackets on columns, placing relief beams under floor slabs, and using composite materials.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Replacement of damaged elements \u2014 in cases where structures have lost more than 50% of their load-bearing capacity, full replacement of individual beams, trusses, or wall sections may be required.<\/span><\/li>\r\n<\/ul>\r\n<p><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/tehnichne-obstezhennya-budivel-i-sporud\/\"><span style=\"font-weight: 400;\">Technical inspection of buildings and structures<\/span><\/a><span style=\"font-weight: 400;\"> is a mandatory stage before starting any restoration work after a fire.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Frequently Asked Questions<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Can I independently assess the condition of structures after a fire?<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">No. Visual inspection does not provide a complete picture. Hidden defects \u2014 loss of rebar-to-concrete bonding, internal cracks in brickwork \u2014 can only be detected using special equipment and verification calculations.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">What documents confirm the possibility of further building operation?<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">The main document is the technical report prepared based on the inspection results. It indicates the category of structural technical condition and recommendations for further operation.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8315-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/14273#wpcf7-f8315-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8315\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8315-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>Leave your question and we will call you<br \/>\nor call us yourself at the number<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone number\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Your question\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"Send\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Building Deterioration After a Fire: How to Assess the Real State of Structures A fire is not just about smoke, soot, and burned premises. High temperatures reaching hundreds of degrees Celsius change concrete structure, weaken rebar, and deform metal elements. Even if the flames did not spread to all floors, &hellip;<\/p>\n","protected":false},"author":2,"featured_media":14161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=14116"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-26T16:12:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-28T18:49:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/pexels-jani-kantokoski-2864880-25490565-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"kevawebGBU\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kevawebGBU\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\"},\"author\":{\"name\":\"kevawebGBU\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\"},\"headline\":\"Building Deterioration After a Fire: How to Assess the Real State of Structures\",\"datePublished\":\"2026-06-26T16:12:45+00:00\",\"dateModified\":\"2026-06-28T18:49:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\"},\"wordCount\":861,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\",\"name\":\"Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-06-26T16:12:45+00:00\",\"dateModified\":\"2026-06-28T18:49:36+00:00\",\"description\":\"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Building Deterioration After a Fire: How to Assess the Real State of Structures\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\",\"name\":\"kevawebGBU\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"caption\":\"kevawebGBU\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine","description":"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/","og_locale":"en_US","og_type":"article","og_title":"Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine","og_description":"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-06-26T16:12:45+00:00","article_modified_time":"2026-06-28T18:49:36+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/pexels-jani-kantokoski-2864880-25490565-scaled.jpg","type":"image\/jpeg"}],"author":"kevawebGBU","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kevawebGBU","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/"},"author":{"name":"kevawebGBU","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce"},"headline":"Building Deterioration After a Fire: How to Assess the Real State of Structures","datePublished":"2026-06-26T16:12:45+00:00","dateModified":"2026-06-28T18:49:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/"},"wordCount":861,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/","name":"Building Deterioration After a Fire: How to Assess the Real State of Structures | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-06-26T16:12:45+00:00","dateModified":"2026-06-28T18:49:36+00:00","description":"Building Deterioration After a Fire \u260e+38(050)697-78-54 Comprehensive building inspection \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/rujnuvannya-budivli-cherez-pozhezhu-yak-oczinyty-realnyj-stan-konstrukczij\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Building Deterioration After a Fire: How to Assess the Real State of Structures"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce","name":"kevawebGBU","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","caption":"kevawebGBU"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14273"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=14273"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14273\/revisions"}],"predecessor-version":[{"id":14301,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/14273\/revisions\/14301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/14161"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=14273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=14273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=14273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}