{"id":13684,"date":"2026-06-25T10:36:49","date_gmt":"2026-06-25T10:36:49","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=13684"},"modified":"2026-06-25T10:36:49","modified_gmt":"2026-06-25T10:36:49","slug":"obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/","title":{"rendered":"Structural Inspection Before SPP Installation: What an Engineer Must Check"},"content":{"rendered":"<h2><span style=\"font-weight: 400;\">Structural Inspection Before SPP Installation: What an Engineer Must Check<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">Installing a solar power plant (SPP) on a roof is not just purchasing panels and mounting them. It is an engineering solution that creates an additional load on the building&#8217;s load-bearing structures. According to building codes, such work is considered an intervention in the object&#8217;s structural scheme, which affects its strength, stability, and, consequently, safety. That is why structural inspection before SPP installation is not just a recommendation but a mandatory condition for legal and safe equipment installation, especially for businesses and apartment buildings.<\/span>\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a consultation<\/a><\/div>\r\n<h2><span style=\"font-weight: 400;\">What Changed in 2026: Procedure Simplification and New Requirements<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">Until recently, installing an SPP on a roof required a full cycle of permit procedures: project development, notification of construction commencement, declaration of readiness, and certification. However, Cabinet of Ministers Resolution No. 77 of January 28, 2026, radically simplified this process. The installation of solar panels on roofs and facades is exempt from any permit or registration procedures in construction.<\/span>\r\n\r\n<span style=\"font-weight: 400;\">However, simplification does not mean a lack of control. Instead of a permit package, one key document is now required \u2014 a report on the technical inspection of the building. This document confirms that load-bearing structures (roof, floor slabs, facade) will withstand the additional load from solar panels. For private, garden, and summer houses, the inspection is carried out at the owner&#8217;s discretion, but for apartment buildings, condominiums (OSBB), and legal entities, it is mandatory.<\/span>\r\n<h2><span style=\"font-weight: 400;\">What Exactly Does the Engineer Check During Structural Inspection<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">Professional structural inspection before SPP installation is a comprehensive procedure conducted in accordance with DSTU 9273:2024 &#8220;Guideline for the inspection of buildings and structures to determine and evaluate their technical condition.&#8221; Engineers from <\/span><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-dahu-dlya-vstanovlennya-sonyachnyh-panelej\/\"><span style=\"font-weight: 400;\">GlobalBud Ukraine<\/span><\/a><span style=\"font-weight: 400;\"> perform a systematic check that includes several key stages:<\/span>\r\n<ol>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Assessment of roof load-bearing capacity \u2014 specialists check the strength and stability of structures to ensure they can withstand the weight of solar panels and mounts. Basic load-bearing elements are analyzed: rafter system, beams, floor slabs, trusses.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Analysis of roofing material and condition \u2014 type of roofing material (metal, tile, slate, bitumen, etc.), its age, and physical state are assessed. An old roof may require repair or replacement before panel installation.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Study of roof pitch and orientation \u2014 this affects the solar system&#8217;s efficiency. The ideal position for panels is with maximum southern orientation at an angle corresponding to the location&#8217;s geographic coordinates.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Waterproofing check \u2014 evaluating whether panel installation will harm roof watertightness and what measures are necessary to maintain it.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Wind load calculation \u2014 solar panels create additional wind resistance, so it is necessary to calculate whether <\/span><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/chy-vytrymaye-dah-sonyachni-paneli\/\"><span style=\"font-weight: 400;\">the roof will withstand<\/span><\/a><span style=\"font-weight: 400;\"> the increased loads.<\/span><\/li>\r\n<\/ol>\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n<h2><span style=\"font-weight: 400;\">Load Calculation: What the Engineer Considers<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">A key element of the inspection is calculating the total load on the structures. Engineers consider several components:<\/span>\r\n<ol>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dead weight of solar panels \u2014 the specific load is approximately 12\u201315 kg\/m\u00b2.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Weight of mounting profiles, fasteners, and cable trays.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ballast for flat roofs (if applied).<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Snow load \u2014 determined in accordance with DBN V.1.2-2:2006 &#8220;Loads and Influences&#8221;. For different regions of Ukraine, limit values are established: south \u2014 \u2248 80\u201390 kg\/m\u00b2, central regions \u2014 \u2248 120\u2013150 kg\/m\u00b2.<\/span><\/li>\r\n    <li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Wind load \u2014 calculated according to the same standards.<\/span><\/li>\r\n<\/ol>\r\n<a href=\"https:\/\/www.gbu.kyiv.ua\/en\/tehnichne-obstezhennya-dahu-dlya-ses\/\"><span style=\"font-weight: 400;\">Professional technical roof inspection for SPP<\/span><\/a><span style=\"font-weight: 400;\"> allows accurately determining if the structures will withstand the total load and avoiding deformations, cracks, or collapse.<\/span>\r\n<h2><span style=\"font-weight: 400;\">Frequently Asked Questions<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">Is structural inspection mandatory for a private house?<\/span>\r\n\r\n<span style=\"font-weight: 400;\">For private, garden, and summer houses, inspection is not mandatory by law. However, experts recommend conducting it to ensure structural safety and avoid potential future problems.<\/span>\r\n\r\n<span style=\"font-weight: 400;\">How long does structural inspection before SPP installation take?<\/span>\r\n\r\n<span style=\"font-weight: 400;\">The duration depends on the roof area, structural complexity, and the scope of necessary research. On average, a visual and instrumental inspection takes from 2 to 4 hours, and the preparation of a technical conclusion takes up to 3 working days.<\/span>\r\n<h2><span style=\"font-weight: 400;\">Conclusion<\/span><\/h2>\r\n<span style=\"font-weight: 400;\">Structural inspection before SPP installation is not a formality, but a necessary stage that guarantees the safe operation of your solar power plant. It allows identifying hidden defects, correctly calculating loads, and obtaining an official technical conclusion necessary for the legal installation of an SPP.<\/span>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8315-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/13684#wpcf7-f8315-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8315\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8315-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>Leave your question and we will call you<br \/>\nor call us yourself at the number<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone number\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Your question\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"Send\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>Structural Inspection Before SPP Installation: What an Engineer Must Check Installing a solar power plant (SPP) on a roof is not just purchasing panels and mounting them. It is an engineering solution that creates an additional load on the building&#8217;s load-bearing structures. According to building codes, such work is considered &hellip;<\/p>\n","protected":false},"author":2,"featured_media":13439,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=13629"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-25T10:36:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/pexels-markusspiske-14384695-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"kevawebGBU\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kevawebGBU\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\"},\"author\":{\"name\":\"kevawebGBU\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\"},\"headline\":\"Structural Inspection Before SPP Installation: What an Engineer Must Check\",\"datePublished\":\"2026-06-25T10:36:49+00:00\",\"dateModified\":\"2026-06-25T10:36:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\"},\"wordCount\":718,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\",\"name\":\"Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-06-25T10:36:49+00:00\",\"dateModified\":\"2026-06-25T10:36:49+00:00\",\"description\":\"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Structural Inspection Before SPP Installation: What an Engineer Must Check\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\",\"name\":\"kevawebGBU\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"caption\":\"kevawebGBU\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine","description":"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/","og_locale":"en_US","og_type":"article","og_title":"Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine","og_description":"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-06-25T10:36:49+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/pexels-markusspiske-14384695-scaled.jpg","type":"image\/jpeg"}],"author":"kevawebGBU","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kevawebGBU","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/"},"author":{"name":"kevawebGBU","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce"},"headline":"Structural Inspection Before SPP Installation: What an Engineer Must Check","datePublished":"2026-06-25T10:36:49+00:00","dateModified":"2026-06-25T10:36:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/"},"wordCount":718,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/","name":"Structural Inspection Before SPP Installation: What an Engineer Must Check | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-06-25T10:36:49+00:00","dateModified":"2026-06-25T10:36:49+00:00","description":"Structural Inspection Before SPP Installation \u260e+38(050)697-78-54 What an Engineer Must Check \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/obstezhennya-konstrukczij-pered-montazhem-ses-shho-maye-pereviryty-inzhener\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Structural Inspection Before SPP Installation: What an Engineer Must Check"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce","name":"kevawebGBU","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","caption":"kevawebGBU"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13684"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=13684"}],"version-history":[{"count":2,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13684\/revisions"}],"predecessor-version":[{"id":13821,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13684\/revisions\/13821"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/13439"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=13684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=13684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=13684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}