{"id":13350,"date":"2026-06-23T13:28:47","date_gmt":"2026-06-23T13:28:47","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=13350"},"modified":"2026-06-23T13:28:47","modified_gmt":"2026-06-23T13:28:47","slug":"yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/","title":{"rendered":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner"},"content":{"rendered":"<h2><span style=\"font-weight: 400;\">How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">The procedure of accepting an apartment from a developer is not just receiving keys and signing papers. It is a complex legal and technical process that requires a systematic approach and attention to detail. How to accept an apartment from a developer so as not to miss a single defect and not lose your funds? Here is a step-by-step action plan that will help you pass this path without losses.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a consultation<\/a><\/div>\r\n\r\n<h2><span style=\"font-weight: 400;\">Step 1. Preparation for acceptance: what needs to be done in advance<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Before heading to the apartment inspection, it is worth preparing. Here is what needs to be done:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Study the contract and project documentation \u2014 familiarize yourself with the terms of the contract, technical passport, and project documentation. You need to know exactly what materials, layout, and characteristics were declared by the developer.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Prepare a list of questions \u2014 write down everything that interests you: regarding materials, technologies, warranty obligations, and timelines for fixing defects.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Plan your time \u2014 an apartment inspection should not be rushed. Allocate enough time to thoroughly check all premises and engineering systems.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Bring company \u2014 invite an independent engineer to the inspection or at least a friend who will help notice what you might have missed.<\/span><\/li>\r\n<\/ol>\r\n<h2><span style=\"font-weight: 400;\">Step 2. Technical inspection: what to check first<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">During the apartment inspection, it is worth following a systematic approach. Here are the key areas for checking:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Room geometry \u2014 check the evenness of walls, floors, and ceilings. Deviations can indicate violations of construction technology.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Windows and doors \u2014 evaluate the installation quality, tightness, and hardware operation. Open and close every window and door, check for misalignments.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Engineering systems \u2014 check the operation of sockets and switches, water pressure, efficiency of heating, and draft in ventilation ducts.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Condition of structures \u2014 inspect walls, floor slabs, and ceilings for cracks, chips, and deformations.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Actual area \u2014 if possible, conduct control measurements of the premises to ensure compliance with technical documentation.<\/span><\/li>\r\n<\/ol>\r\n<p><span style=\"font-weight: 400;\">If you do not have special equipment and engineering knowledge, <\/span><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/pryjmannya-kvartyry-prymishhennya-vid-zabudovnyka\/\"><span style=\"font-weight: 400;\">order a professional apartment acceptance<\/span><\/a><span style=\"font-weight: 400;\">, which will allow you to identify all hidden defects.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Step 3. Fixation of defects: how to properly compile a defect report<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">If defects are found during the inspection, do not sign the acceptance certificate until they are eliminated. Instead, compile a defect report \u2014 an official document that records all identified shortcomings. Here is what a defect report should contain:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Detailed description of each defect \u2014 location, nature, size, and degree of severity.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Photo and video fixation \u2014 visual evidence confirming the presence of defects.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">References to regulatory documents \u2014 specific DBN norms or other construction standards that have been violated.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Timelines for elimination \u2014 the date by which the developer is obliged to fix the identified shortcomings.<\/span><\/li>\r\n<\/ol>\r\n<p><span style=\"font-weight: 400;\">The defect report is signed by both parties \u2014 the buyer (or their representative) and the developer. Signing the report certifies that the parties agree with the presence of the recorded defects and recognize the developer&#8217;s duty to eliminate them.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2><span style=\"font-weight: 400;\">Step 4. Signing the acceptance certificate: what to pay attention to<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Signing the acceptance certificate is the final stage, which has legal consequences. Here is what you should pay attention to:<\/span><\/p>\r\n<ol>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensure all defects are eliminated \u2014 if you have signed a defect report, wait for full elimination of all recorded shortcomings.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Check data relevance \u2014 the certificate should contain the correct characteristics of the apartment: area, number of rooms, and the condition of the object.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Pay attention to warranty obligations \u2014 the certificate must contain information about warranty terms for construction works and equipment.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Keep copies of all documents \u2014 acceptance certificate, defect report, technical passport, contract.<\/span><\/li>\r\n<\/ol>\r\n<p><span style=\"font-weight: 400;\">If all defects are not identified in time, <\/span><a href=\"https:\/\/www.gbu.kyiv.ua\/en\/kapitalnyj-remont-kvartyry\/\"><span style=\"font-weight: 400;\">major renovation of the apartment<\/span><\/a><span style=\"font-weight: 400;\"> will be much more expensive. <\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Frequently Asked Questions about How to Accept an Apartment from a Developer<\/span><\/h2>\r\n<p><b>What to do if the developer pressures and demands to immediately sign the acceptance certificate?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">No circumstances can deprive you of the right to a thorough inspection of the purchased property. An investor has a legal right to involve their own experts to assess the state of the apartment. Do not succumb to manipulation \u2014 sign documents only after all remarks are fully eliminated or included in a defect report.<\/span><\/p>\r\n<p><b>Can I file claims after signing an acceptance certificate that had no remarks?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">Legislation provides for warranty periods for construction works, however, proving that technical damages or shortcomings arose due to the developer&#8217;s fault, rather than during the start of your renovation, will be significantly more difficult, longer, and more expensive.<\/span><\/p>\r\n<p><b>How much time should an apartment inspection take before signing the certificate?<\/b><\/p>\r\n<p><span style=\"font-weight: 400;\">The duration of the inspection depends on the apartment&#8217;s area and the number of checks. On average, a professional inspection takes approximately 3 hours. Do not rush \u2014 it is better to spend time on a thorough check now than to spend money on eliminating defects later.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Conclusion<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">How to accept an apartment from a developer without losses? The answer is simple: systematically, attentively, and with the involvement of professionals. Preparation, thorough technical inspection, proper fixation of defects, and legally sound signing of documents \u2014 this is the key to successful acceptance.<\/span> <a href=\"https:\/\/www.gbu.kyiv.ua\/en\/pryjnyattya-obyekta-vid-zabudovnyka\/\"><span style=\"font-weight: 400;\">Acceptance of an object from a developer<\/span><\/a><span style=\"font-weight: 400;\"> is a comprehensive service that includes technical inspection, compilation of a defect report, and legal support.<\/span><\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8315-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/13350#wpcf7-f8315-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8315\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8315-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>Leave your question and we will call you<br \/>\nor call us yourself at the number<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone number\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Your question\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"Send\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner The procedure of accepting an apartment from a developer is not just receiving keys and signing papers. It is a complex legal and technical process that requires a systematic approach and attention to detail. &hellip;<\/p>\n","protected":false},"author":2,"featured_media":13289,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=13291"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-23T13:28:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/side-view-man-working-design-plan-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"kevawebGBU\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kevawebGBU\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\"},\"author\":{\"name\":\"kevawebGBU\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\"},\"headline\":\"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner\",\"datePublished\":\"2026-06-23T13:28:47+00:00\",\"dateModified\":\"2026-06-23T13:28:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\"},\"wordCount\":927,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\",\"name\":\"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-06-23T13:28:47+00:00\",\"dateModified\":\"2026-06-23T13:28:47+00:00\",\"description\":\"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce\",\"name\":\"kevawebGBU\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r\",\"caption\":\"kevawebGBU\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine","description":"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/","og_locale":"en_US","og_type":"article","og_title":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine","og_description":"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-06-23T13:28:47+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/06\/side-view-man-working-design-plan-scaled.jpg","type":"image\/jpeg"}],"author":"kevawebGBU","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kevawebGBU","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/"},"author":{"name":"kevawebGBU","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce"},"headline":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner","datePublished":"2026-06-23T13:28:47+00:00","dateModified":"2026-06-23T13:28:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/"},"wordCount":927,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/","name":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-06-23T13:28:47+00:00","dateModified":"2026-06-23T13:28:47+00:00","description":"How to Accept an Apartment from a Developer \u260e+38(050)697-78-54 Step-by-step plan for accepting an apartment \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-pryjnyaty-kvartyru-vid-zabudovnyka-pokrokovyj-plan-dij-dlya-majbutnogo-vlasnyka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"How to Accept an Apartment from a Developer: A Step-by-Step Action Plan for the Future Owner"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/a95a3235cf19f3f34a742f63862675ce","name":"kevawebGBU","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7bdf2687bbe1f2be10cbf34ef52068b8?s=96&d=mm&r=r","caption":"kevawebGBU"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/kevawebgbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13350"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=13350"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13350\/revisions"}],"predecessor-version":[{"id":13370,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/13350\/revisions\/13370"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/13289"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=13350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=13350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=13350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}