{"id":11867,"date":"2026-02-23T02:50:22","date_gmt":"2026-02-23T02:50:22","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=11867"},"modified":"2026-02-23T02:50:22","modified_gmt":"2026-02-23T02:50:22","slug":"inklyuzyvnist-obyekta-budivnycztva","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/","title":{"rendered":"Accessibility of a Construction Project"},"content":{"rendered":"<h2 data-start=\"283\" data-end=\"363\">Accessibility of a Construction Project<\/h2>\r\n<p data-start=\"365\" data-end=\"714\">Accessibility of a construction project is not only the developer\u2019s social responsibility, but also a direct requirement under Ukrainian law. Ensuring barrier-free access to buildings and structures is governed by the State Building Codes (DBN), the Law of Ukraine \u201cOn Regulation of Urban Development Activities\u201d, the Law of Ukraine \u201cOn Architectural Activity\u201d, and other subordinate regulations.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a Consultation<\/a><\/div>\r\n\r\n<p data-start=\"716\" data-end=\"914\">For developers, design organizations, and property owners, accessibility is critically important at all stages\u2014from the preparation of design documentation to commissioning the facility for operation.<\/p>\r\n<h2 data-start=\"921\" data-end=\"960\">What Does Accessibility in Construction Mean?<\/h2>\r\n<p data-start=\"962\" data-end=\"1108\">Accessibility (inclusive design) is a set of architectural, engineering, and planning solutions that ensure unhindered access to a facility for:<\/p>\r\n<ul data-start=\"1110\" data-end=\"1268\">\r\n<li data-start=\"1110\" data-end=\"1132\">\r\n<p data-start=\"1112\" data-end=\"1132\">persons with disabilities;<\/p>\r\n<\/li>\r\n<li data-start=\"1133\" data-end=\"1170\">\r\n<p data-start=\"1135\" data-end=\"1170\">persons with reduced mobility (PRM);<\/p>\r\n<\/li>\r\n<li data-start=\"1171\" data-end=\"1193\">\r\n<p data-start=\"1173\" data-end=\"1193\">older persons;<\/p>\r\n<\/li>\r\n<li data-start=\"1194\" data-end=\"1223\">\r\n<p data-start=\"1196\" data-end=\"1223\">parents with strollers;<\/p>\r\n<\/li>\r\n<li data-start=\"1224\" data-end=\"1268\">\r\n<p data-start=\"1226\" data-end=\"1268\">persons with temporary mobility limitations.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"1270\" data-end=\"1512\">The key regulatory document in this area is DBN V.2.2-40:2018 \u201cAccessibility of Buildings and Structures\u201d, which sets mandatory requirements for site planning, entrances, evacuation routes, sanitary facilities, lifts\/elevators, wayfinding and information signage, and other elements.<\/p>\r\n<h2 data-start=\"1519\" data-end=\"1578\">Regulatory Framework for Accessibility of a Construction Project<\/h2>\r\n<p data-start=\"1580\" data-end=\"1624\">Ensuring accessibility is mandatory for:<\/p>\r\n<ul data-start=\"1626\" data-end=\"1712\">\r\n<li data-start=\"1626\" data-end=\"1647\">\r\n<p data-start=\"1628\" data-end=\"1647\">new construction;<\/p>\r\n<\/li>\r\n<li data-start=\"1648\" data-end=\"1664\">\r\n<p data-start=\"1650\" data-end=\"1664\">reconstruction;<\/p>\r\n<\/li>\r\n<li data-start=\"1665\" data-end=\"1688\">\r\n<p data-start=\"1667\" data-end=\"1688\">major (capital) repairs;<\/p>\r\n<\/li>\r\n<li data-start=\"1689\" data-end=\"1712\">\r\n<p data-start=\"1691\" data-end=\"1712\">restoration of facilities.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"1714\" data-end=\"1742\">In accordance with applicable legislation:<\/p>\r\n<ol data-start=\"1744\" data-end=\"2035\">\r\n<li data-start=\"1744\" data-end=\"1826\">\r\n<p data-start=\"1747\" data-end=\"1826\">Design documentation must include a section addressing accessibility for persons with reduced mobility (PRM).<\/p>\r\n<\/li>\r\n<li data-start=\"1827\" data-end=\"1889\">\r\n<p data-start=\"1830\" data-end=\"1889\">During project expert review, compliance with DBN requirements is verified.<\/p>\r\n<\/li>\r\n<li data-start=\"1890\" data-end=\"2035\">\r\n<p data-start=\"1893\" data-end=\"2035\">When commissioning a facility for operation, state architectural and construction control authorities verify the actual implementation of accessibility requirements.<\/p>\r\n<\/li>\r\n<\/ol>\r\n<p data-start=\"2037\" data-end=\"2080\">Failure to comply with the standards may constitute grounds for:<\/p>\r\n<ul data-start=\"2082\" data-end=\"2217\">\r\n<li data-start=\"2082\" data-end=\"2124\">\r\n<p data-start=\"2084\" data-end=\"2124\">refusal to issue a readiness\/commissioning certificate;<\/p>\r\n<\/li>\r\n<li data-start=\"2125\" data-end=\"2146\">\r\n<p data-start=\"2127\" data-end=\"2146\">administrative fines;<\/p>\r\n<\/li>\r\n<li data-start=\"2147\" data-end=\"2164\">\r\n<p data-start=\"2149\" data-end=\"2164\">court disputes;<\/p>\r\n<\/li>\r\n<li data-start=\"2165\" data-end=\"2217\">\r\n<p data-start=\"2167\" data-end=\"2217\">an obligation to remedy violations at the developer\u2019s\/owner\u2019s own expense.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<h2 data-start=\"2224\" data-end=\"2267\">Core Accessibility Requirements for Buildings<\/h2>\r\n<p data-start=\"2269\" data-end=\"2294\"><strong>1. Accessible Site<\/strong><\/p>\r\n<ul data-start=\"2296\" data-end=\"2455\">\r\n<li data-start=\"2296\" data-end=\"2329\">\r\n<p data-start=\"2298\" data-end=\"2329\">Barrier-free approach to the building.<\/p>\r\n<\/li>\r\n<li data-start=\"2330\" data-end=\"2361\">\r\n<p data-start=\"2332\" data-end=\"2361\">Ramps with code-compliant slope.<\/p>\r\n<\/li>\r\n<li data-start=\"2362\" data-end=\"2410\">\r\n<p data-start=\"2364\" data-end=\"2410\">Tactile elements for persons with visual impairments.<\/p>\r\n<\/li>\r\n<li data-start=\"2411\" data-end=\"2455\">\r\n<p data-start=\"2413\" data-end=\"2455\">Parking spaces designated for persons with disabilities.<\/p>\r\n<\/li>\r\n<\/ul>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Would you like to learn the cost of services<br \/>for your specific situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<p data-start=\"2457\" data-end=\"2476\"><strong>2. Entrance Area<\/strong><\/p>\r\n<ul data-start=\"2478\" data-end=\"2610\">\r\n<li data-start=\"2478\" data-end=\"2515\">\r\n<p data-start=\"2480\" data-end=\"2515\">Minimum clear width of doorways.<\/p>\r\n<\/li>\r\n<li data-start=\"2516\" data-end=\"2563\">\r\n<p data-start=\"2518\" data-end=\"2563\">No thresholds, or thresholds limited to a minimal height.<\/p>\r\n<\/li>\r\n<li data-start=\"2564\" data-end=\"2610\">\r\n<p data-start=\"2566\" data-end=\"2610\">Automatic doors or doors that are easy to open.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"2612\" data-end=\"2642\"><strong>3. Vertical Circulation<\/strong><\/p>\r\n<ul data-start=\"2644\" data-end=\"2731\">\r\n<li data-start=\"2644\" data-end=\"2676\">\r\n<p data-start=\"2646\" data-end=\"2676\">Elevators with sufficient internal dimensions.<\/p>\r\n<\/li>\r\n<li data-start=\"2677\" data-end=\"2697\">\r\n<p data-start=\"2679\" data-end=\"2697\">Handrails on staircases.<\/p>\r\n<\/li>\r\n<li data-start=\"2698\" data-end=\"2731\">\r\n<p data-start=\"2700\" data-end=\"2731\">High-contrast marking of stair edges.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"2733\" data-end=\"2771\">4. Sanitary and Hygiene Facilities<\/p>\r\n<ul data-start=\"2773\" data-end=\"2887\">\r\n<li data-start=\"2773\" data-end=\"2805\">\r\n<p data-start=\"2775\" data-end=\"2805\">Specially equipped accessible restrooms.<\/p>\r\n<\/li>\r\n<li data-start=\"2806\" data-end=\"2849\">\r\n<p data-start=\"2808\" data-end=\"2849\">Maneuvering space for a wheelchair user.<\/p>\r\n<\/li>\r\n<li data-start=\"2850\" data-end=\"2887\">\r\n<p data-start=\"2852\" data-end=\"2887\">Grab bars and emergency assistance call buttons.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<h2 data-start=\"2894\" data-end=\"2933\">When Is an Accessibility Audit Necessary?<\/h2>\r\n<p data-start=\"2935\" data-end=\"2980\">An accessibility audit is advisable in the following cases:<\/p>\r\n<ul data-start=\"2982\" data-end=\"3145\">\r\n<li data-start=\"2982\" data-end=\"3026\">\r\n<p data-start=\"2984\" data-end=\"3026\">before submitting documentation for expert review;<\/p>\r\n<\/li>\r\n<li data-start=\"3027\" data-end=\"3068\">\r\n<p data-start=\"3029\" data-end=\"3068\">before commissioning the facility for operation;<\/p>\r\n<\/li>\r\n<li data-start=\"3069\" data-end=\"3107\">\r\n<p data-start=\"3071\" data-end=\"3107\">during reconstruction of existing buildings;<\/p>\r\n<\/li>\r\n<li data-start=\"3108\" data-end=\"3145\">\r\n<p data-start=\"3110\" data-end=\"3145\">in the event of inspections by supervisory authorities.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"3147\" data-end=\"3253\">A professional audit helps identify non-compliance issues before an official inspection and minimizes financial risks.<\/p>\r\n<h2 data-start=\"3260\" data-end=\"3290\">Common Developer Mistakes<\/h2>\r\n<ol data-start=\"3292\" data-end=\"3550\">\r\n<li data-start=\"3292\" data-end=\"3373\">\r\n<p data-start=\"3295\" data-end=\"3373\">Including an \u201cAccessibility\u201d section in a purely formal manner, without properly developing the solutions.<\/p>\r\n<\/li>\r\n<li data-start=\"3374\" data-end=\"3415\">\r\n<p data-start=\"3377\" data-end=\"3415\">Non-compliance with the code-required ramp slope.<\/p>\r\n<\/li>\r\n<li data-start=\"3416\" data-end=\"3464\">\r\n<p data-start=\"3419\" data-end=\"3464\">Lack of adequate maneuvering space in restrooms.<\/p>\r\n<\/li>\r\n<li data-start=\"3465\" data-end=\"3513\">\r\n<p data-start=\"3468\" data-end=\"3513\">Elevator dimensions not meeting DBN requirements.<\/p>\r\n<\/li>\r\n<li data-start=\"3514\" data-end=\"3550\">\r\n<p data-start=\"3517\" data-end=\"3550\">Ignoring tactile wayfinding.<\/p>\r\n<\/li>\r\n<\/ol>\r\n<p data-start=\"3552\" data-end=\"3670\">Such violations often result in the need to rework elements that have already been constructed, which significantly increases the project budget.<\/p>\r\n<h2 data-start=\"3677\" data-end=\"3717\">Accessibility as a Competitive Advantage<\/h2>\r\n<p data-start=\"3719\" data-end=\"3843\">For commercial real estate (shopping malls, business centers, hotels, medical facilities), accessibility is not only a legal requirement, but also:<\/p>\r\n<ul data-start=\"3845\" data-end=\"3990\">\r\n<li data-start=\"3845\" data-end=\"3877\">\r\n<p data-start=\"3847\" data-end=\"3877\">an expansion of the target audience;<\/p>\r\n<\/li>\r\n<li data-start=\"3878\" data-end=\"3908\">\r\n<p data-start=\"3880\" data-end=\"3908\">an enhancement of brand reputation;<\/p>\r\n<\/li>\r\n<li data-start=\"3909\" data-end=\"3948\">\r\n<p data-start=\"3911\" data-end=\"3948\">alignment with international standards;<\/p>\r\n<\/li>\r\n<li data-start=\"3949\" data-end=\"3990\">\r\n<p data-start=\"3951\" data-end=\"3990\">greater attractiveness for foreign investors.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"3992\" data-end=\"4115\">This is particularly relevant for facilities that cooperate with international companies or plan to obtain certification under ESG standards.<\/p>\r\n<h2 data-start=\"4122\" data-end=\"4172\">Comprehensive Support for Ensuring Accessibility<\/h2>\r\n<p data-start=\"4174\" data-end=\"4286\">GlobalBud Ukraine provides a full range of services related to ensuring accessibility of construction projects:<\/p>\r\n<ul data-start=\"4288\" data-end=\"4547\">\r\n<li data-start=\"4288\" data-end=\"4354\">\r\n<p data-start=\"4290\" data-end=\"4354\">preparation of the accessibility section as part of the design documentation;<\/p>\r\n<\/li>\r\n<li data-start=\"4355\" data-end=\"4391\">\r\n<p data-start=\"4357\" data-end=\"4391\">technical audit for compliance with DBN requirements;<\/p>\r\n<\/li>\r\n<li data-start=\"4392\" data-end=\"4440\">\r\n<p data-start=\"4394\" data-end=\"4440\">legal support throughout the expert review process;<\/p>\r\n<\/li>\r\n<li data-start=\"4441\" data-end=\"4492\">\r\n<p data-start=\"4443\" data-end=\"4492\">support during commissioning of the facility for operation;<\/p>\r\n<\/li>\r\n<li data-start=\"4493\" data-end=\"4547\">\r\n<p data-start=\"4495\" data-end=\"4547\">consulting regarding reconstruction of existing facilities.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"4549\" data-end=\"4599\">More details about the services are available in the sections:<\/p>\r\n<ul data-start=\"4600\" data-end=\"4743\">\r\n<li data-start=\"4600\" data-end=\"4637\">\r\n<p data-start=\"4602\" data-end=\"4637\">\u201cDesign of Construction Projects\u201d<\/p>\r\n<\/li>\r\n<li data-start=\"4638\" data-end=\"4663\">\r\n<p data-start=\"4640\" data-end=\"4663\">\u201cConstruction Expert Review\u201d<\/p>\r\n<\/li>\r\n<li data-start=\"4664\" data-end=\"4700\">\r\n<p data-start=\"4666\" data-end=\"4700\">\u201cCommissioning of Facilities\u201d<\/p>\r\n<\/li>\r\n<li data-start=\"4701\" data-end=\"4743\">\r\n<p data-start=\"4703\" data-end=\"4743\">\u201cLegal Support in the Construction Sector\u201d<\/p>\r\n<\/li>\r\n<\/ul>\r\n<h2 data-start=\"4750\" data-end=\"4761\">Conclusion<\/h2>\r\n<p data-start=\"4763\" data-end=\"4970\">Accessibility of a construction project is a mandatory component of modern design and real estate development. Failure to comply with accessibility requirements creates legal, financial, and reputational risks for the developer.<\/p>\r\n<p data-start=\"4972\" data-end=\"5304\">By contacting GlobalBud Ukraine, you will receive professional support from experienced engineers and lawyers who will ensure that your facility complies with the requirements of Ukrainian legislation. We provide \u201cturnkey\u201d services\u2014from concept to commissioning\u2014and work with both individuals and legal entities, including international companies.<\/p>\r\n<p data-start=\"5306\" data-end=\"5406\" data-is-last-node=\"\" data-is-only-node=\"\">Contact us to obtain a professional consultation and minimize risks already at the design stage.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Do you need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help resolve the issue <strong>within as little as 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8293-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/11867#wpcf7-f8293-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8293\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8293-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>\u0417\u0430\u043b\u0438\u0448\u0442\u0435 \u0432\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0456 \u043c\u0438 \u0432\u0430\u043c \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0454\u043c\u043e<br \/>\n\u0430\u0431\u043e \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0439\u0442\u0435 \u0441\u0430\u043c\u0456 \u043d\u0430\u043c \u0437\u0430 \u043d\u043e\u043c\u0435\u0440\u043e\u043c<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0456\u043c&#039;\u044f\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"\u041d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Accessibility of a Construction Project Accessibility of a construction project is not only the developer\u2019s social responsibility, but also a direct requirement under Ukrainian law. Ensuring barrier-free access to buildings and structures is governed by the State Building Codes (DBN), the Law of Ukraine \u201cOn Regulation of Urban Development Activities\u201d, &hellip;<\/p>\n","protected":false},"author":1,"featured_media":11860,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=11858"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Accessibility of a Construction Project | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Accessibility of a Construction Project | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-23T02:50:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/02\/inklyuzyvnist-obyekta-budivnycztva-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_gbu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_gbu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\"},\"author\":{\"name\":\"admin_gbu\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\"},\"headline\":\"Accessibility of a Construction Project\",\"datePublished\":\"2026-02-23T02:50:22+00:00\",\"dateModified\":\"2026-02-23T02:50:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\"},\"wordCount\":774,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\",\"name\":\"Accessibility of a Construction Project | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2026-02-23T02:50:22+00:00\",\"dateModified\":\"2026-02-23T02:50:22+00:00\",\"description\":\"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Accessibility of a Construction Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\",\"name\":\"admin_gbu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"caption\":\"admin_gbu\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Accessibility of a Construction Project | GlobalBud Ukraine","description":"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/","og_locale":"en_US","og_type":"article","og_title":"Accessibility of a Construction Project | GlobalBud Ukraine","og_description":"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2026-02-23T02:50:22+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2026\/02\/inklyuzyvnist-obyekta-budivnycztva-1-scaled.jpg","type":"image\/jpeg"}],"author":"admin_gbu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_gbu","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/"},"author":{"name":"admin_gbu","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b"},"headline":"Accessibility of a Construction Project","datePublished":"2026-02-23T02:50:22+00:00","dateModified":"2026-02-23T02:50:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/"},"wordCount":774,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/","name":"Accessibility of a Construction Project | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2026-02-23T02:50:22+00:00","dateModified":"2026-02-23T02:50:22+00:00","description":"Inclusivity of the construction site \u260e+38(050)697-78-54 Accessibility for people with disabilities \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/inklyuzyvnist-obyekta-budivnycztva\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Accessibility of a Construction Project"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b","name":"admin_gbu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","caption":"admin_gbu"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11867"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=11867"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11867\/revisions"}],"predecessor-version":[{"id":11868,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11867\/revisions\/11868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/11860"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=11867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=11867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=11867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}