{"id":11177,"date":"2025-09-13T19:21:49","date_gmt":"2025-09-13T19:21:49","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=11177"},"modified":"2025-09-13T19:21:49","modified_gmt":"2025-09-13T19:21:49","slug":"yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/","title":{"rendered":"How to Put an Unfinished Construction Project into Operation"},"content":{"rendered":"<h2 data-start=\"54\" data-end=\"126\">How to Put an Unfinished Construction Project into Operation: Step-by-Step Guide<\/h2>\r\n<p data-start=\"128\" data-end=\"522\"><strong data-start=\"128\" data-end=\"189\">Commissioning an Unfinished Construction Project<\/strong> is a complex but entirely feasible procedure that requires legal preparation, technical expertise, and strict compliance with the current legislation of Ukraine. In this article, we will review what qualifies as an unfinished construction project, the conditions required for its legalization, and how to correctly go through all stages of commissioning.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get a Consultation<\/a><\/div>\r\n\r\n<h2 data-start=\"529\" data-end=\"573\">What Is an Unfinished Construction Project?<\/h2>\r\n<p data-start=\"575\" data-end=\"821\">According to the Law of Ukraine &#8220;On Regulation of Urban Development,&#8221; an <strong data-start=\"644\" data-end=\"680\">unfinished construction project<\/strong> is a facility that has not been put into operation in the prescribed manner, but construction work has already been carried out on it (fully or partially).<\/p>\r\n<p data-start=\"823\" data-end=\"851\">Such projects are divided into:<\/p>\r\n<ul data-start=\"853\" data-end=\"1089\">\r\n<li data-start=\"853\" data-end=\"941\">\r\n<p data-start=\"855\" data-end=\"941\">projects with suspended or frozen construction (with valid permitting documentation);<\/p>\r\n<\/li>\r\n<li data-start=\"942\" data-end=\"998\">\r\n<p data-start=\"944\" data-end=\"998\">projects without proper permits (unauthorized construction);<\/p>\r\n<\/li>\r\n<li data-start=\"999\" data-end=\"1089\">\r\n<p data-start=\"1001\" data-end=\"1089\">partially built facilities that do not comply with current regulations or project documentation.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<h2 data-start=\"1096\" data-end=\"1162\">When Is Commissioning an Unfinished Construction Possible?<\/h2>\r\n<p data-start=\"1164\" data-end=\"1257\">It is possible to put an unfinished construction project into operation only under several conditions:<\/p>\r\n<ul data-start=\"1259\" data-end=\"1562\">\r\n<li data-start=\"1259\" data-end=\"1324\">\r\n<p data-start=\"1261\" data-end=\"1324\">there is a valid <strong data-start=\"1263\" data-end=\"1292\">land ownership or lease right<\/strong> (state act, lease agreement, etc.);<\/p>\r\n<\/li>\r\n<li data-start=\"1325\" data-end=\"1407\">\r\n<p data-start=\"1327\" data-end=\"1407\">valid or restored <strong data-start=\"1349\" data-end=\"1375\">permitting documentation<\/strong> for construction works is available;<\/p>\r\n<\/li>\r\n<li data-start=\"1408\" data-end=\"1490\">\r\n<p data-start=\"1410\" data-end=\"1490\">the project is subject to <strong data-start=\"1426\" data-end=\"1456\">completion or reconstruction<\/strong> according to technical feasibility;<\/p>\r\n<\/li>\r\n<li data-start=\"1491\" data-end=\"1562\">\r\n<p data-start=\"1493\" data-end=\"1562\">the performed works <strong data-start=\"1509\" data-end=\"1561\">comply with DBN, DSTU standards, and project documentation<\/strong>.<\/p>\r\n<\/li>\r\n<\/ul>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call our consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2 data-start=\"1569\" data-end=\"1642\">Step-by-Step Guide: How to Commission an Unfinished Construction Project<\/h2>\r\n<p data-start=\"1644\" data-end=\"1683\"><strong>Step 1. Technical Inspection of the Project<\/strong><\/p>\r\n<p data-start=\"1685\" data-end=\"1862\">First of all, it is necessary to carry out a <strong data-start=\"1717\" data-end=\"1752\">technical inspection of the structures<\/strong> to determine the level of readiness and condition of the performed works. This inspection is conducted by a certified specialist.<\/p>\r\n<blockquote data-start=\"1864\" data-end=\"1987\">\r\n<p data-start=\"1866\" data-end=\"1987\">As a result, you receive a <strong data-start=\"1892\" data-end=\"1910\">technical report<\/strong> that records the physical condition of the project and its compliance with building standards.<\/p>\r\n<\/blockquote>\r\n<p data-start=\"1994\" data-end=\"2054\"><strong>Step 2. Updating or Developing Project Documentation<\/strong><\/p>\r\n<p data-start=\"2056\" data-end=\"2118\">If the project is partially built or with deviations, it is necessary to:<\/p>\r\n<ul data-start=\"2120\" data-end=\"2214\">\r\n<li data-start=\"2120\" data-end=\"2158\">\r\n<p data-start=\"2122\" data-end=\"2158\">make changes to the initial project;<\/p>\r\n<\/li>\r\n<li data-start=\"2159\" data-end=\"2214\">\r\n<p data-start=\"2161\" data-end=\"2214\">or develop a new construction\/reconstruction project.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"2216\" data-end=\"2293\">For projects with consequences class CC2 or CC3, the project undergoes a <strong data-start=\"2278\" data-end=\"2292\">mandatory expert review<\/strong>.<\/p>\r\n<p data-start=\"2300\" data-end=\"2360\"><strong>Step 3. Restoring Permitting Documentation (if necessary)<\/strong><\/p>\r\n<p data-start=\"2362\" data-end=\"2436\">If construction was carried out without a permit or documents were lost, it is necessary to:<\/p>\r\n<ul data-start=\"2438\" data-end=\"2606\">\r\n<li data-start=\"2438\" data-end=\"2557\">\r\n<p data-start=\"2440\" data-end=\"2557\"><strong data-start=\"2440\" data-end=\"2475\">legalize unauthorized construction<\/strong> (through court or voluntary declaration procedure, if allowed by law);<\/p>\r\n<\/li>\r\n<li data-start=\"2558\" data-end=\"2606\">\r\n<p data-start=\"2560\" data-end=\"2606\"><strong data-start=\"2560\" data-end=\"2585\">obtain a new permit<\/strong> for completion of the works.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"2613\" data-end=\"2694\"><strong>Step 4. Completion of Construction According to the Updated Project Documentation<\/strong><\/p>\r\n<p data-start=\"2696\" data-end=\"2830\">After resolving legal issues, it is necessary to complete construction works according to the updated or approved project.<\/p>\r\n<p data-start=\"2837\" data-end=\"2880\"><strong>Step 5. Technical Inventory of the Project<\/strong><\/p>\r\n<p data-start=\"2882\" data-end=\"3027\">After the works are completed, the client applies to a certified organization to carry out a <strong data-start=\"2971\" data-end=\"2999\">technical inventory<\/strong>. As a result, you receive:<\/p>\r\n<ul data-start=\"3029\" data-end=\"3155\">\r\n<li data-start=\"3029\" data-end=\"3061\">\r\n<p data-start=\"3031\" data-end=\"3061\"><strong data-start=\"3031\" data-end=\"3060\">technical passport of the project<\/strong>;<\/p>\r\n<\/li>\r\n<li data-start=\"3062\" data-end=\"3155\">\r\n<p data-start=\"3064\" data-end=\"3155\">documents required for submission to DIAM (State Inspectorate of Architecture and Urban Planning).<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"3162\" data-end=\"3220\"><strong>Step 6. Submission of Documents for Commissioning<\/strong><\/p>\r\n<p data-start=\"3222\" data-end=\"3339\">Collection and submission of documents to DIAM or through the Unified State Electronic System in the field of construction. Main documents:<\/p>\r\n<ul data-start=\"3341\" data-end=\"3496\">\r\n<li data-start=\"3341\" data-end=\"3349\">\r\n<p data-start=\"3343\" data-end=\"3349\">application;<\/p>\r\n<\/li>\r\n<li data-start=\"3350\" data-end=\"3370\">\r\n<p data-start=\"3352\" data-end=\"3370\">technical passport;<\/p>\r\n<\/li>\r\n<li data-start=\"3371\" data-end=\"3388\">\r\n<p data-start=\"3373\" data-end=\"3388\">readiness certificate;<\/p>\r\n<\/li>\r\n<li data-start=\"3389\" data-end=\"3428\">\r\n<p data-start=\"3391\" data-end=\"3428\">title documents for land;<\/p>\r\n<\/li>\r\n<li data-start=\"3429\" data-end=\"3454\">\r\n<p data-start=\"3431\" data-end=\"3454\">permitting documentation;<\/p>\r\n<\/li>\r\n<li data-start=\"3455\" data-end=\"3496\">\r\n<p data-start=\"3457\" data-end=\"3496\">compliance certificates (if necessary).<\/p>\r\n<\/li>\r\n<\/ul>\r\n<p data-start=\"3503\" data-end=\"3541\"><strong>Step 7. Registration of Property Rights<\/strong><\/p>\r\n<p data-start=\"3543\" data-end=\"3680\">After receiving the commissioning certificate, the project is subject to <strong data-start=\"3614\" data-end=\"3679\">state registration in the State Register of Property Rights to Real Estate<\/strong>.<\/p>\r\n<h2 data-start=\"3687\" data-end=\"3724\">Common Mistakes to Avoid<\/h2>\r\n<ul data-start=\"3726\" data-end=\"3947\">\r\n<li data-start=\"3726\" data-end=\"3775\">\r\n<p data-start=\"3728\" data-end=\"3775\">ignoring the need for a technical inspection;<\/p>\r\n<\/li>\r\n<li data-start=\"3776\" data-end=\"3830\">\r\n<p data-start=\"3778\" data-end=\"3830\">attempting to commission without a project or permit;<\/p>\r\n<\/li>\r\n<li data-start=\"3831\" data-end=\"3889\">\r\n<p data-start=\"3833\" data-end=\"3889\">preparing documents for a project that does not comply with DBN standards;<\/p>\r\n<\/li>\r\n<li data-start=\"3890\" data-end=\"3947\">\r\n<p data-start=\"3892\" data-end=\"3947\">using forged technical passports or certificates.<\/p>\r\n<\/li>\r\n<\/ul>\r\n<blockquote data-start=\"3949\" data-end=\"4066\">\r\n<p data-start=\"3951\" data-end=\"4066\">&#x26a0;&#xfe0f; Without proper support from a lawyer and engineer, there is a high risk of refusal of commissioning or legal disputes.<\/p>\r\n<\/blockquote>\r\n<h2 data-start=\"4073\" data-end=\"4091\">Frequently Asked Questions<\/h2>\r\n<p data-start=\"4093\" data-end=\"4324\"><strong data-start=\"4093\" data-end=\"4150\">Can unauthorized construction be put into operation?<\/strong><br data-start=\"4150\" data-end=\"4153\" \/>Yes, but only after legalization through court or under a simplified procedure for certain facilities (in particular, individual housing up to 500 m\u00b2 built before 2025).<\/p>\r\n<p data-start=\"4326\" data-end=\"4458\"><strong data-start=\"4326\" data-end=\"4376\">Is a new project required if the changes are minor?<\/strong><br data-start=\"4376\" data-end=\"4379\" \/>Yes, any changes to structural elements require project updating.<\/p>\r\n<h2 data-start=\"4465\" data-end=\"4476\">Conclusions<\/h2>\r\n<p data-start=\"4478\" data-end=\"4780\">Commissioning an unfinished construction project is a complex technical and legal process that includes technical inspection, updating project documentation, legalizing permits, and completing construction works. It is important to act strictly within the law and with the involvement of qualified professionals.<\/p>\r\n<h2 data-start=\"4787\" data-end=\"4825\">Contact <strong data-start=\"4804\" data-end=\"4825\">GlobalBud Ukraine<\/strong><\/h2>\r\n<p data-start=\"4827\" data-end=\"5135\"><strong data-start=\"4836\" data-end=\"4857\">GlobalBud Ukraine<\/strong> has many years of experience supporting unfinished construction projects. Our engineers, designers, and lawyers provide <strong data-start=\"4972\" data-end=\"5002\">full \u201cturnkey\u201d support<\/strong> \u2014 from inspection to commissioning. We work with both individuals and legal entities, including international companies.<\/p>\r\n<p data-start=\"5137\" data-end=\"5251\"><strong data-start=\"5137\" data-end=\"5155\">Submit your request<\/strong> \u2014 and we will help legalize your project quickly, safely, and in accordance with current legislation.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an Initial Consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help solve your problem <strong>within 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8293-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/11177#wpcf7-f8293-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8293\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8293-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>\u0417\u0430\u043b\u0438\u0448\u0442\u0435 \u0432\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0456 \u043c\u0438 \u0432\u0430\u043c \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0454\u043c\u043e<br \/>\n\u0430\u0431\u043e \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0439\u0442\u0435 \u0441\u0430\u043c\u0456 \u043d\u0430\u043c \u0437\u0430 \u043d\u043e\u043c\u0435\u0440\u043e\u043c<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0456\u043c&#039;\u044f\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"\u041d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>How to Put an Unfinished Construction Project into Operation: Step-by-Step Guide Commissioning an Unfinished Construction Project is a complex but entirely feasible procedure that requires legal preparation, technical expertise, and strict compliance with the current legislation of Ukraine. In this article, we will review what qualifies as an unfinished construction &hellip;<\/p>\n","protected":false},"author":1,"featured_media":11169,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=11168"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-13T19:21:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/09\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_gbu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_gbu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\"},\"author\":{\"name\":\"admin_gbu\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\"},\"headline\":\"How to Put an Unfinished Construction Project into Operation\",\"datePublished\":\"2025-09-13T19:21:49+00:00\",\"dateModified\":\"2025-09-13T19:21:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\"},\"wordCount\":786,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\",\"name\":\"How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2025-09-13T19:21:49+00:00\",\"dateModified\":\"2025-09-13T19:21:49+00:00\",\"description\":\"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Put an Unfinished Construction Project into Operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\",\"name\":\"admin_gbu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"caption\":\"admin_gbu\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine","description":"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/","og_locale":"en_US","og_type":"article","og_title":"How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine","og_description":"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2025-09-13T19:21:49+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/09\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo-scaled.jpg","type":"image\/jpeg"}],"author":"admin_gbu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_gbu","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/"},"author":{"name":"admin_gbu","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b"},"headline":"How to Put an Unfinished Construction Project into Operation","datePublished":"2025-09-13T19:21:49+00:00","dateModified":"2025-09-13T19:21:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/"},"wordCount":786,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/","name":"How to Put an Unfinished Construction Project into Operation | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2025-09-13T19:21:49+00:00","dateModified":"2025-09-13T19:21:49+00:00","description":"Commissioning of dual-purpose structures (DPS) \u260e+38(050)697-78-54 Commissioning of DPS \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/yak-vvesty-v-ekspluatacziyu-nezavershene-budivnycztvo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"How to Put an Unfinished Construction Project into Operation"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b","name":"admin_gbu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","caption":"admin_gbu"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11177"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=11177"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11177\/revisions"}],"predecessor-version":[{"id":11178,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/11177\/revisions\/11178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/11169"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=11177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=11177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=11177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}