{"id":10249,"date":"2025-03-17T08:15:00","date_gmt":"2025-03-17T08:15:00","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=10249"},"modified":"2025-03-17T08:15:00","modified_gmt":"2025-03-17T08:15:00","slug":"suprovid-na-usih-etapah-budivnycztva-azs","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/","title":{"rendered":"Support at all stages of filling station construction"},"content":{"rendered":"<h2 data-start=\"0\" data-end=\"47\"><strong data-start=\"2\" data-end=\"45\">Support at All Stages of Gas Station Construction<\/strong><\/h2>\r\n<p data-start=\"49\" data-end=\"345\">The construction of a gas station (GS) is a complex process that requires compliance with building codes, environmental standards, and legal regulations. For a successful project implementation, professional support is needed at all stages \u2013 from land selection to commissioning.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Order Support<\/a><\/div>\r\n\r\n<h2 data-start=\"347\" data-end=\"385\"><strong data-start=\"350\" data-end=\"383\">Main Stages of Gas Station Construction<\/strong><\/h2>\r\n<h3 data-start=\"387\" data-end=\"447\"><strong data-start=\"391\" data-end=\"445\">1. Land Selection and Urban Planning Analysis<\/strong><\/h3>\r\n<p data-start=\"448\" data-end=\"663\">Before starting construction, it is necessary to assess the land plot&#8217;s compliance with the requirements of DBN B.2.3-5:2018 <em data-start=\"550\" data-end=\"593\">&#8220;Automobile Roads. General Provisions&#8221;<\/em> and DBN B.2.2-20:2008 <em data-start=\"615\" data-end=\"639\">&#8220;Gas Stations&#8221;<\/em>. It is important to consider:<\/p>\r\n<ul data-start=\"664\" data-end=\"908\">\r\n<li data-start=\"664\" data-end=\"739\"><strong data-start=\"666\" data-end=\"686\">Land Category<\/strong> \u2013 whether the construction of a gas station is allowed in the selected zone.<\/li>\r\n<li data-start=\"740\" data-end=\"832\"><strong data-start=\"742\" data-end=\"780\">Availability of Engineering Communications<\/strong> \u2013 water supply, electricity, sewage.<\/li>\r\n<li data-start=\"833\" data-end=\"908\"><strong data-start=\"835\" data-end=\"872\">Compliance with Sanitary Protection Zones<\/strong> \u2013 according to DSP 173-96 requirements.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"910\" data-end=\"954\"><strong data-start=\"914\" data-end=\"952\">2. Development of Project Documentation<\/strong><\/h3>\r\n<p data-start=\"955\" data-end=\"1029\">The design of a gas station must comply with DBN requirements and include the following aspects:<\/p>\r\n<ul data-start=\"1030\" data-end=\"1389\">\r\n<li data-start=\"1030\" data-end=\"1125\"><strong data-start=\"1032\" data-end=\"1052\">General Plan<\/strong> \u2013 location of buildings, fuel tanks, service areas.<\/li>\r\n<li data-start=\"1126\" data-end=\"1200\"><strong data-start=\"1128\" data-end=\"1153\">Structural Solutions<\/strong> \u2013 selection of materials and construction technologies.<\/li>\r\n<li data-start=\"1201\" data-end=\"1286\"><strong data-start=\"1203\" data-end=\"1223\">Engineering Networks<\/strong> \u2013 water supply, electricity, drainage systems.<\/li>\r\n<li data-start=\"1287\" data-end=\"1389\"><strong data-start=\"1289\" data-end=\"1312\">Fire Safety Measures<\/strong> \u2013 in accordance with DBN B.1.1-7:2016 <em data-start=\"1346\" data-end=\"1386\">&#8220;Fire Safety of Construction Objects&#8221;<\/em>.<\/li>\r\n<\/ul>\r\n<p data-start=\"1391\" data-end=\"1508\">Project documentation undergoes an expert review following the Law of Ukraine &#8220;On Regulation of Urban Development Activities.&#8221;<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h3 data-start=\"1510\" data-end=\"1556\"><strong data-start=\"1514\" data-end=\"1554\">3. Obtaining Permits<\/strong><\/h3>\r\n<p data-start=\"1557\" data-end=\"1619\">Gas station construction is impossible without obtaining the necessary permits:<\/p>\r\n<ul data-start=\"1620\" data-end=\"1890\">\r\n<li data-start=\"1620\" data-end=\"1693\"><strong data-start=\"1622\" data-end=\"1657\">Urban Planning Conditions and Restrictions<\/strong> (according to DBN A.2.2-3:2014).<\/li>\r\n<li data-start=\"1694\" data-end=\"1805\"><strong data-start=\"1696\" data-end=\"1721\">Construction Permit<\/strong> (issued by the State Inspection of Architecture and Urban Planning of Ukraine \u2013 DIAM).<\/li>\r\n<li data-start=\"1806\" data-end=\"1890\"><strong data-start=\"1808\" data-end=\"1831\">Environmental Assessments<\/strong> \u2013 compliance with environmental legislation.<\/li>\r\n<\/ul>\r\n<h3 data-start=\"1892\" data-end=\"1937\"><strong data-start=\"1896\" data-end=\"1935\">4. Construction and Equipment Installation<\/strong><\/h3>\r\n<p data-start=\"1938\" data-end=\"1968\">Construction work includes:<\/p>\r\n<ul data-start=\"1969\" data-end=\"2169\">\r\n<li data-start=\"1969\" data-end=\"2020\">Site preparation and foundation laying.<\/li>\r\n<li data-start=\"2021\" data-end=\"2068\">Installation of fuel storage tanks.<\/li>\r\n<li data-start=\"2069\" data-end=\"2118\">Connection of communications and engineering systems.<\/li>\r\n<li data-start=\"2119\" data-end=\"2169\">Installation of fuel dispensing equipment.<\/li>\r\n<\/ul>\r\n<p data-start=\"2171\" data-end=\"2251\">Compliance with construction standards is monitored through technical supervision.<\/p>\r\n<p><iframe loading=\"lazy\" title=\"\u0429\u043e \u0442\u0430\u043a\u0435 \u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d #\u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e\u043a\u0438\u0457\u0432 #\u0442\u0435\u0445\u043f\u0430\u0441\u043f\u043e\u0440\u0442 #\u0434\u043e\u0437\u0432\u0456\u043b\u043d\u0430\u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e\" width=\"999\" height=\"562\" src=\"https:\/\/www.youtube.com\/embed\/Oef5yYZDaHE?feature=oembed&#038;enablejsapi=1&#038;origin=https:\/\/www.gbu.kyiv.ua\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\r\n<h3 data-start=\"2253\" data-end=\"2293\"><strong data-start=\"2257\" data-end=\"2291\">5. Commissioning the Gas Station<\/strong><\/h3>\r\n<p data-start=\"2294\" data-end=\"2380\">The final stage is obtaining a certificate of readiness. This includes:<\/p>\r\n<ul data-start=\"2381\" data-end=\"2509\">\r\n<li data-start=\"2381\" data-end=\"2422\">Verification of compliance with technical requirements.<\/li>\r\n<li data-start=\"2423\" data-end=\"2460\">Fire and environmental assessments.<\/li>\r\n<li data-start=\"2461\" data-end=\"2509\">State architectural and construction control.<\/li>\r\n<\/ul>\r\n<p data-start=\"2511\" data-end=\"2614\">After that, the gas station is entered into the register of high-risk objects and receives an operating permit.<\/p>\r\n<h2 data-start=\"2616\" data-end=\"2667\"><strong data-start=\"2619\" data-end=\"2665\">Why Choose GlobalBud Ukraine?<\/strong><\/h2>\r\n<p data-start=\"2668\" data-end=\"3122\">The company <strong data-start=\"2677\" data-end=\"2697\">GlobalBud Ukraine<\/strong> provides a full range of services for supporting gas station construction, including:<\/p>\r\n<ul>\r\n<li><strong>Legal Support<\/strong> \u2013 obtaining permits, interaction with state authorities.<\/li>\r\n<li><strong>Design and Expertise<\/strong> \u2013 development of technical documentation in compliance with regulations.<\/li>\r\n<li><strong>Technical Supervision<\/strong> \u2013 quality control of construction work.<\/li>\r\n<li><strong>Commissioning<\/strong> \u2013 assistance in obtaining all necessary certificates and permits.<\/li>\r\n<\/ul>\r\n<p>Contact <strong>GlobalBud Ukraine<\/strong>, and we will provide professional support for your gas station construction at all stages!<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">We will help you solve the problem<strong> within 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8293-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/10249#wpcf7-f8293-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8293\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8293-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>\u0417\u0430\u043b\u0438\u0448\u0442\u0435 \u0432\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0456 \u043c\u0438 \u0432\u0430\u043c \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0454\u043c\u043e<br \/>\n\u0430\u0431\u043e \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0439\u0442\u0435 \u0441\u0430\u043c\u0456 \u043d\u0430\u043c \u0437\u0430 \u043d\u043e\u043c\u0435\u0440\u043e\u043c<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0456\u043c&#039;\u044f\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"\u041d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Support at All Stages of Gas Station Construction The construction of a gas station (GS) is a complex process that requires compliance with building codes, environmental standards, and legal regulations. For a successful project implementation, professional support is needed at all stages \u2013 from land selection to commissioning. Main Stages &hellip;<\/p>\n","protected":false},"author":1,"featured_media":10239,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=10238"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Support at all stages of filling station construction | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Support at all stages of filling station construction | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-17T08:15:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/03\/suprovid-na-usih-etapah-budivnycztva-azs-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_gbu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_gbu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\"},\"author\":{\"name\":\"admin_gbu\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\"},\"headline\":\"Support at all stages of filling station construction\",\"datePublished\":\"2025-03-17T08:15:00+00:00\",\"dateModified\":\"2025-03-17T08:15:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\"},\"wordCount\":460,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\",\"name\":\"Support at all stages of filling station construction | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2025-03-17T08:15:00+00:00\",\"dateModified\":\"2025-03-17T08:15:00+00:00\",\"description\":\"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Support at all stages of filling station construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\",\"name\":\"admin_gbu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"caption\":\"admin_gbu\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Support at all stages of filling station construction | GlobalBud Ukraine","description":"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/","og_locale":"en_US","og_type":"article","og_title":"Support at all stages of filling station construction | GlobalBud Ukraine","og_description":"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2025-03-17T08:15:00+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/03\/suprovid-na-usih-etapah-budivnycztva-azs-scaled.jpg","type":"image\/jpeg"}],"author":"admin_gbu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_gbu","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/"},"author":{"name":"admin_gbu","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b"},"headline":"Support at all stages of filling station construction","datePublished":"2025-03-17T08:15:00+00:00","dateModified":"2025-03-17T08:15:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/"},"wordCount":460,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/","name":"Support at all stages of filling station construction | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2025-03-17T08:15:00+00:00","dateModified":"2025-03-17T08:15:00+00:00","description":"Support at all stages of gas station construction \u260e+38(050)697-78-54 Permit and Certificate for gas stations \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/suprovid-na-usih-etapah-budivnycztva-azs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Support at all stages of filling station construction"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b","name":"admin_gbu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","caption":"admin_gbu"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10249"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=10249"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10249\/revisions"}],"predecessor-version":[{"id":10250,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10249\/revisions\/10250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/10239"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=10249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=10249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=10249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}