{"id":10236,"date":"2025-03-14T08:07:32","date_gmt":"2025-03-14T08:07:32","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?p=10236"},"modified":"2025-03-14T08:07:32","modified_gmt":"2025-03-14T08:07:32","slug":"akt-gotovnosti-obyekta-do-ekspluatacziyi","status":"publish","type":"post","link":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/","title":{"rendered":"Certificate of Readiness for Operation"},"content":{"rendered":"<h2 data-start=\"0\" data-end=\"74\">Certificate of Readiness for Operation<\/h2>\r\n<p data-start=\"76\" data-end=\"431\">The Certificate of Readiness for Operation is an official document confirming the completion of construction and compliance of the facility with project documentation, building standards, and regulations. It is mandatory for putting the facility into operation in accordance with the requirements of the Law of Ukraine &#8220;On Regulation of Urban Development Activities&#8221; and State Building Standards (DBN).<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Get the Certificate<\/a><\/div>\r\n<h2 data-start=\"433\" data-end=\"484\">What is a Certificate of Readiness for Operation<\/h2>\r\n<p data-start=\"486\" data-end=\"745\">The Certificate of Readiness for Operation is a document issued after the completion of all construction and installation works, testing, and elimination of identified deficiencies. It serves as the basis for submitting a declaration or obtaining a certificate of commissioning.<\/p>\r\n<h2 data-start=\"747\" data-end=\"793\">When is the Certificate Required<\/h2>\r\n<p data-start=\"795\" data-end=\"860\">The certificate is issued after the completion of construction or reconstruction of:<\/p>\r\n<ul data-start=\"862\" data-end=\"1000\">\r\n<li data-start=\"862\" data-end=\"896\">Residential and non-residential buildings<\/li>\r\n<li data-start=\"897\" data-end=\"935\">Industrial and commercial facilities<\/li>\r\n<li data-start=\"936\" data-end=\"972\">Engineering structures and communications<\/li>\r\n<li data-start=\"973\" data-end=\"1000\">Infrastructure facilities<\/li>\r\n<\/ul>\r\n<p data-start=\"1002\" data-end=\"1237\">For different categories of facilities, legislation provides different commissioning procedures. For example, for facilities of consequence class CC1, submission of a declaration of readiness is sufficient, while for <strong>CC2 and CC3<\/strong>, a certificate is required.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your case?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2 data-start=\"1239\" data-end=\"1271\">Who Signs the Certificate<\/h2>\r\n<p data-start=\"1273\" data-end=\"1593\">The certificate is signed by the construction customer, general contractor, general designer, as well as representatives of state architectural and construction control authorities (DABC, DIAM). In the case of commissioning engineering infrastructure facilities, representatives of operating organizations may also be involved.<\/p>\r\n<h2 data-start=\"1595\" data-end=\"1633\">Key Requirements for Certificate Preparation<\/h2>\r\n<p data-start=\"1635\" data-end=\"1673\">The document must include the following information:<\/p>\r\n<ul data-start=\"1675\" data-end=\"2040\">\r\n<li data-start=\"1675\" data-end=\"1723\">Full name of the facility and its location<\/li>\r\n<li data-start=\"1724\" data-end=\"1783\">Information about the customer, contractor, and designer<\/li>\r\n<li data-start=\"1784\" data-end=\"1863\">Data on permit documentation (construction permit, urban planning conditions)<\/li>\r\n<li data-start=\"1864\" data-end=\"1912\">Results of technical tests and inspections<\/li>\r\n<li data-start=\"1913\" data-end=\"1988\">Confirmation of compliance with building standards and project documentation<\/li>\r\n<li data-start=\"1989\" data-end=\"2040\">Conclusions on the facility\u2019s readiness for operation<\/li>\r\n<\/ul>\r\n<p><iframe loading=\"lazy\" title=\"\u0429\u043e \u0442\u0430\u043a\u0435 \u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d #\u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e\u043a\u0438\u0457\u0432 #\u0442\u0435\u0445\u043f\u0430\u0441\u043f\u043e\u0440\u0442 #\u0434\u043e\u0437\u0432\u0456\u043b\u043d\u0430\u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e\" width=\"999\" height=\"562\" src=\"https:\/\/www.youtube.com\/embed\/Oef5yYZDaHE?feature=oembed&#038;enablejsapi=1&#038;origin=https:\/\/www.gbu.kyiv.ua\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\r\n<h2 data-start=\"2042\" data-end=\"2083\">Consequences of Absence of the Certificate<\/h2>\r\n<p data-start=\"2085\" data-end=\"2370\">Without this document, it is impossible to commission a building, making its legal use impossible. Using a facility without proper documentation may lead to fines and administrative liability under the Code of Administrative Offenses of Ukraine.<\/p>\r\n<h2 data-start=\"2372\" data-end=\"2427\">How to Obtain a Certificate of Readiness for Operation<\/h2>\r\n<p data-start=\"2429\" data-end=\"2729\" data-is-last-node=\"\" data-is-only-node=\"\">To properly prepare the Certificate of Readiness and avoid delays in commissioning, contact <strong data-start=\"2547\" data-end=\"2567\">Global Boot Ukraine<\/strong>. Our specialists provide legal and technical support for all stages of construction and commissioning in accordance with current Ukrainian legislation.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Need an initial consultation?<\/h3>\r\n<div class=\"gutenform__text text\">\r\n<p>We will help solve your problem <strong>within 1 day<\/strong><\/p>\r\n<\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8293-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/10236#wpcf7-f8293-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8293\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8293-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>\u0417\u0430\u043b\u0438\u0448\u0442\u0435 \u0432\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0456 \u043c\u0438 \u0432\u0430\u043c \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0454\u043c\u043e<br \/>\n\u0430\u0431\u043e \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0439\u0442\u0435 \u0441\u0430\u043c\u0456 \u043d\u0430\u043c \u0437\u0430 \u043d\u043e\u043c\u0435\u0440\u043e\u043c<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0456\u043c&#039;\u044f\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"\u041d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Certificate of Readiness for Operation The Certificate of Readiness for Operation is an official document confirming the completion of construction and compliance of the facility with project documentation, building standards, and regulations. It is mandatory for putting the facility into operation in accordance with the requirements of the Law of &hellip;<\/p>\n","protected":false},"author":1,"featured_media":10227,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?p=10226"},"categories":[5],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Certificate of Readiness for Operation | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Certificate of Readiness for Operation | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-14T08:07:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/03\/akt-gotovnosti-obyekta-do-ekspluatacziyi-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_gbu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_gbu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\"},\"author\":{\"name\":\"admin_gbu\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\"},\"headline\":\"Certificate of Readiness for Operation\",\"datePublished\":\"2025-03-14T08:07:32+00:00\",\"dateModified\":\"2025-03-14T08:07:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\"},\"wordCount\":423,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"articleSection\":[\"\u041d\u043e\u0432\u0438\u043d\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\",\"name\":\"Certificate of Readiness for Operation | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2025-03-14T08:07:32+00:00\",\"dateModified\":\"2025-03-14T08:07:32+00:00\",\"description\":\"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Certificate of Readiness for Operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b\",\"name\":\"admin_gbu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r\",\"caption\":\"admin_gbu\"},\"url\":\"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Certificate of Readiness for Operation | GlobalBud Ukraine","description":"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/","og_locale":"en_US","og_type":"article","og_title":"Certificate of Readiness for Operation | GlobalBud Ukraine","og_description":"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","article_published_time":"2025-03-14T08:07:32+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2025\/03\/akt-gotovnosti-obyekta-do-ekspluatacziyi-scaled.jpg","type":"image\/jpeg"}],"author":"admin_gbu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_gbu","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#article","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/"},"author":{"name":"admin_gbu","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b"},"headline":"Certificate of Readiness for Operation","datePublished":"2025-03-14T08:07:32+00:00","dateModified":"2025-03-14T08:07:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/"},"wordCount":423,"commentCount":0,"publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"articleSection":["\u041d\u043e\u0432\u0438\u043d\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/","name":"Certificate of Readiness for Operation | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2025-03-14T08:07:32+00:00","dateModified":"2025-03-14T08:07:32+00:00","description":"Certificate of Readiness for Operation \u260e+38(050)697-78-54 Certificate of readiness of the object \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/akt-gotovnosti-obyekta-do-ekspluatacziyi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Certificate of Readiness for Operation"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/bd9bd92ec11cf13548fe251aadd9074b","name":"admin_gbu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c79b7e1921cbe924b81e47d8bb76fcb2?s=96&d=mm&r=r","caption":"admin_gbu"},"url":"https:\/\/www.gbu.kyiv.ua\/author\/admin_gbu\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10236"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=10236"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10236\/revisions"}],"predecessor-version":[{"id":10237,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/posts\/10236\/revisions\/10237"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/10227"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=10236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/categories?post=10236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/tags?post=10236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}