{"id":9321,"date":"2024-10-01T13:44:14","date_gmt":"2024-10-01T13:44:14","guid":{"rendered":"https:\/\/www.gbu.kyiv.ua\/?page_id=9321"},"modified":"2024-10-01T13:44:14","modified_gmt":"2024-10-01T13:44:14","slug":"audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva","status":"publish","type":"page","link":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/","title":{"rendered":"Audit of risks and regulatory requirements in preparation for construction"},"content":{"rendered":"<h2>Audit of risks and regulatory requirements in preparation for construction<\/h2>\r\n<p>The construction of any facility, regardless of its scale, requires careful preparation. One of the key stages of preparation is a risk and compliance audit, which minimizes possible legal and technical problems and avoids violations of construction standards.<\/p>\r\n<p>Such an audit is mandatory to ensure the safety and legality of construction.<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-button pwmblock button\"><a id=\"\" class=\"orange-btn advice-btn linkbtn btn _modal-btn banner-form-btn\" href=\"#\" data-modal=\"banner-form-btn\">Make an audit<\/a><\/div>\r\n\r\n<h2>What is a risk audit in construction?<\/h2>\r\n<p><strong>Risk audit<\/strong> is the process of identifying, analyzing, and assessing possible risks that may arise during construction. The main purpose of such an audit is to minimize the impact of negative factors on project implementation.<\/p>\r\n<p><strong>The main types of risks assessed during the audit include<\/strong><\/p>\r\n<ul>\r\n<li><strong>Legal risks<\/strong> &#8211; assessment of land rights, availability of construction permits, compliance with building codes and regulations.<\/li>\r\n<li><strong>Technical risks<\/strong> &#8211; possible problems with construction works due to geological conditions, deficiencies in project documentation, technical condition of engineering networks, etc.<\/li>\r\n<li><strong>Financial risks<\/strong> &#8211; mismatch of the budget or financial resources with the real needs of the project.<\/li>\r\n<li><strong>Environmental risks<\/strong> &#8211; the impact of construction on the environment, compliance with environmental regulations.<\/li>\r\n<\/ul>\r\n<h2>Regulatory requirements for construction<\/h2>\r\n<p>When preparing for construction, it is important to take into account regulatory requirements governed by national legislation, in particular the State Construction Standards of Ukraine (SBS).<\/p>\r\n<p><strong>A regulatory compliance audit includes checking the following aspects:<\/strong><\/p>\r\n<ul>\r\n<li><strong>Land plot documentation<\/strong> &#8211; availability of all necessary rights to use the land, construction permits, urban planning conditions and restrictions.<\/li>\r\n<li><strong>Project documentation<\/strong> &#8211; compliance of the project with the requirements of the State Building Standards and other regulatory legal acts related to construction.<\/li>\r\n<li><strong>Licenses and permits<\/strong> &#8211; checking the availability of all necessary permits and licenses for construction work, approval of state control bodies.<\/li>\r\n<li><strong>Environmental impact assessment<\/strong> &#8211; conducting an environmental impact assessment, if required by law for a particular facility.<\/li>\r\n<li><strong>Technical conditions for connection to utility network<\/strong>s &#8211; obtaining approvals for connection to power, water, sewage and other systems.<\/li>\r\n<\/ul>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-simple pwmblock simple  section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"simple__contblock\">\r\n<div class=\"simple__wrapper\">\r\n<h3 class=\"simple__title\">Want to know the cost of services<br \/>for your situation?<\/h3>\r\n<div class=\"simple__text text\">\r\n<p>Call a consultant<\/p>\r\n<\/div>\r\n<a id=\"\" class=\"orange-btn advice-btn linkbtn btn undefined\" href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a><\/div>\r\n<\/div>\r\n<\/div>\r\n\r\n<h2>Stages of the audit process<\/h2>\r\n<p><strong>The risk and compliance audit process typically includes the following steps:<\/strong><\/p>\r\n<ul>\r\n<li><strong>Preliminary analysis<\/strong> &#8211; collection and review of initial documentation on the land plot and project.<\/li>\r\n<li><strong>Legal due diligence<\/strong> &#8211; checking all permits confirming the ownership or use of the land, as well as the project&#8217;s compliance with local regulations.<\/li>\r\n<li><strong>Technical audit<\/strong> &#8211; assessment of the technical condition of the infrastructure, availability of technical conditions and opportunities for connecting to utility networks.<\/li>\r\n<li><strong>Financial risk assessment<\/strong> &#8211; checking the budget and financial plan of the project, predicting possible deviations.<\/li>\r\n<\/ul>\r\n<p>The final conclusion is a detailed report on possible risks and recommendations for minimizing them.<\/p>\r\n<h2>Benefits of conducting an audit before starting construction<\/h2>\r\n<p><strong>Conducting an audit of risks and regulatory requirements allows you to:<\/strong><\/p>\r\n<ul>\r\n<li>Ensure the legality of construction and avoid fines or suspension of work by regulatory authorities.<\/li>\r\n<li>Identify potential problems at the preparation stage and develop ways to solve them, which will help avoid unnecessary costs in the future.<\/li>\r\n<li>Increase the investment attractiveness of the project for potential investors or partners.<\/li>\r\n<li>Ensure that construction meets environmental and safety standards.<\/li>\r\n<\/ul>\r\n<h2>Why should you contact GlobalBud Ukraine?<\/h2>\r\n<p><strong>GlobalBud Ukraine<\/strong> provides a full range of risk and regulatory compliance audit services for construction projects of any complexity. Our specialists have in-depth knowledge of construction law and regulatory requirements, which allows us to minimize risks at all stages of construction. We offer:<\/p>\r\n<ul>\r\n<li>An integrated approach to project audit;<\/li>\r\n<li>In-depth analysis of legal and technical documentation;<\/li>\r\n<li>Customized solutions to minimize risks.<\/li>\r\n<\/ul>\r\n<p>Contact GlobalBud Ukraine to ensure the successful implementation of your construction project without unnecessary risks and problems!<\/p>\r\n\r\n<div id=\"\" class=\"wp-block-roseta-form pwmblock gutenform section-padding-top-none section-padding-bottom-none autow\">\r\n<div class=\"gutenform__contblock\">\r\n<div class=\"gutenform__wrapper form-info-group\">\r\n<h3 class=\"gutenform__title titleinfo\">Initial consultation is required?<\/h3>\r\n<div class=\"gutenform__text text\">We will help you solve the problem<strong> within 1 day<\/strong><\/div>\r\n<div class=\"gutenform__shortcode\">\r\n<div class=\"gutenform__shortcode\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8293-o1\" lang=\"uk\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/pages\/9321#wpcf7-f8293-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"8293\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.7.7\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"uk\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8293-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<div class=\"gutenform-cf7\">\n\t<h5>\u0417\u0430\u043b\u0438\u0448\u0442\u0435 \u0432\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0456 \u043c\u0438 \u0432\u0430\u043c \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0454\u043c\u043e<br \/>\n\u0430\u0431\u043e \u0437\u0430\u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0443\u0439\u0442\u0435 \u0441\u0430\u043c\u0456 \u043d\u0430\u043c \u0437\u0430 \u043d\u043e\u043c\u0435\u0440\u043e\u043c<br \/>\n<a href=\"tel:+380506977854\">+38 (050) 697-78-54<\/a>\n\t<\/h5>\n\t<div class=\"form-grid-bg\">\n\t\t<div class=\"form-grid\">\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0456\u043c&#039;\u044f\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/label><br \/>\n<label><span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" class=\"wpcf7-form-control wpcf7-text wpcf7-tel wpcf7-validates-as-required wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" value=\"\" type=\"tel\" name=\"tel\" \/><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t\t<div class=\"form-column\">\n\t\t\t\t<p><label><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"\u0412\u0430\u0448\u0435 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f\" name=\"your-message\"><\/textarea><\/span><\/label>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden form-info\" value=\"\" type=\"hidden\" name=\"form-info\" \/>\n\t\t<p><input class=\"wpcf7-form-control has-spinner wpcf7-submit orange-btn\" type=\"submit\" value=\"\u041d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>Audit of risks and regulatory requirements in preparation for construction The construction of any facility, regardless of its scale, requires careful preparation. One of the key stages of preparation is a risk and compliance audit, which minimizes possible legal and technical problems and avoids violations of construction standards. Such an &hellip;<\/p>\n","protected":false},"author":1,"featured_media":9315,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"_locale":"en_US","_original_post":"https:\/\/www.gbu.kyiv.ua\/?page_id=9314"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine<\/title>\n<meta name=\"description\" content=\"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine\" \/>\n<meta property=\"og:description\" content=\"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/\" \/>\n<meta property=\"og:site_name\" content=\"GlobalBud Ukraine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/globalbudua\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2024\/10\/audyt-ryzykiv-v-budivnycztvi.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1709\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/\",\"name\":\"Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine\",\"isPartOf\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\"},\"datePublished\":\"2024-10-01T13:44:14+00:00\",\"dateModified\":\"2024-10-01T13:44:14+00:00\",\"description\":\"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/www.gbu.kyiv.ua\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Audit of risks and regulatory requirements in preparation for construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#website\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"name\":\"GlobalBud Ukraine\",\"description\":\"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!\",\"publisher\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#organization\",\"name\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"contentUrl\":\"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png\",\"width\":180,\"height\":180,\"caption\":\"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d\"},\"image\":{\"@id\":\"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/globalbudua\",\"https:\/\/www.instagram.com\/gbu_ua\/\",\"https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine","description":"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/","og_locale":"en_US","og_type":"article","og_title":"Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine","og_description":"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","og_url":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/","og_site_name":"GlobalBud Ukraine","article_publisher":"https:\/\/www.facebook.com\/globalbudua","og_image":[{"width":2560,"height":1709,"url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2024\/10\/audyt-ryzykiv-v-budivnycztvi.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/","url":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/","name":"Audit of risks and regulatory requirements in preparation for construction | GlobalBud Ukraine","isPartOf":{"@id":"https:\/\/www.gbu.kyiv.ua\/#website"},"datePublished":"2024-10-01T13:44:14+00:00","dateModified":"2024-10-01T13:44:14+00:00","description":"Audit of risks and regulatory requirements in preparation for construction \u260e+38(050)697-78-54 Lawyer in construction \u2b50GlobalBud Ukraine\u2b50 \u271415 years of experience","breadcrumb":{"@id":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.gbu.kyiv.ua\/en\/audyt-ryzykiv-ta-normatyvnyh-vymog-pry-pidgotovczi-do-budivnycztva\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/www.gbu.kyiv.ua\/en\/"},{"@type":"ListItem","position":2,"name":"Audit of risks and regulatory requirements in preparation for construction"}]},{"@type":"WebSite","@id":"https:\/\/www.gbu.kyiv.ua\/#website","url":"https:\/\/www.gbu.kyiv.ua\/","name":"GlobalBud Ukraine","description":"\u0417 \u043d\u0430\u043c\u0438 \u0431\u0443\u0434\u0443\u0432\u0430\u0442\u0438 \u043b\u0435\u0433\u043a\u043e!","publisher":{"@id":"https:\/\/www.gbu.kyiv.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gbu.kyiv.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gbu.kyiv.ua\/#organization","name":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d","url":"https:\/\/www.gbu.kyiv.ua\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/","url":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","contentUrl":"https:\/\/www.gbu.kyiv.ua\/wp-content\/uploads\/2020\/11\/logaster-2-facebook-profile-180px.png","width":180,"height":180,"caption":"\u0413\u043b\u043e\u0431\u0430\u043b\u0411\u0443\u0434 \u042e\u043a\u0440\u0435\u0439\u043d"},"image":{"@id":"https:\/\/www.gbu.kyiv.ua\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/globalbudua","https:\/\/www.instagram.com\/gbu_ua\/","https:\/\/www.youtube.com\/channel\/UCoo1g75ED5Atj89bLFjJo4w?view_as=subscriber"]}]}},"_links":{"self":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/pages\/9321"}],"collection":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/comments?post=9321"}],"version-history":[{"count":1,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/pages\/9321\/revisions"}],"predecessor-version":[{"id":9322,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/pages\/9321\/revisions\/9322"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media\/9315"}],"wp:attachment":[{"href":"https:\/\/www.gbu.kyiv.ua\/wp-json\/wp\/v2\/media?parent=9321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}